Laserfiche WebLink
Capital Improvement Plan <br />City of Elk River, Minnesota <br />2009 thru 2013 <br />Project # `" i` Dui ~` ' <br />Project Name Main Street Mill and Overlay ~~,= h~~i~ , ^ ~ ~~' - ;• ~ ~;~ <br />Type Improvement Priority n/a <br />Useful Life 25 yeazs Contact Engineer <br />Category Street Construction Department Infrastructure Improvements <br />F. <br />.~ new <br />Description <br />Mill main street from Lowell Ave to Bridge; remove millings, resurface, and restripe street. <br />Justification <br />vlain Street was rebuilt in 1988, over the last 20 years there have been several open cuts of the street and numerous <br />;racks have developed. Given the amount of traffic Main Street carries (5,200-7,500 vehicles a day in 2007) its time to <br />•esurface the road. <br />Expenditures 2009 2010 2011 2012 2013 Total <br />Construction/Maintenance 500,000 500,000 <br />Total 500,000 500,000 <br />Funding Sources 2009 2010 2011 2012 2013 Total <br />Special Assessments 100,000 100,000 <br />Street Improvement Reserve 400,000 400,000 <br />Total 500,000 500,000 <br />Page 20 <br />