Laserfiche WebLink
4,I SPEC, INC. <br /> <br />5801 Duluth Street <br />Minneapolis, MN 55422 <br />Ph. 6 t 2-546-3434 <br /> Fax 6 t 2-546-8669 <br /> <br />555 West Layton Ave. <br />Suite 420 <br />Milwaukee, WI 53207 <br />Ph. 414-744-6962 <br /> Fax 414-744-6981 <br /> <br /> Engineering & <br /> Architectural <br /> <br /> services for <br />root~, pa vements, <br />exterior walls, and <br /> outdoor sports <br /> <br /> ~cilities. <br /> <br />March 27, 1997 <br /> <br />Mr. Clifford Skogstad <br />City of Elk River <br />P.O. Box 490 <br />13065 Orono Parkway <br />Elk River, Minnesota 55330 <br /> <br />Re: <br /> <br />Proposal for Engineering Services for Reroofmg of Elk River Public Library <br />Roof Area is approximately 6000 square feet. <br /> <br />Dear Mr. Skogstad: <br /> <br />As requested, we are pleased to provide this proposal to furnish engineering services <br />for the development of construction documents and to provide construction <br />observation and quality control testing for the City of Elk River. <br /> <br />SCOPE OF SERVICES <br /> <br />Site Verification <br /> <br />Roof-related details will be verified in the field using exploratory test openings to <br />allow for dimensioning and sketching of the actual existing conditions. Along with <br />dimensioning the building, this information will be used to provide a basis for the <br />development of the reroofmg design. <br /> <br />Construction Documents <br /> <br />Drawings and a project manual will be prepared for this project..If, during the desig_n <br />phase, it is determined there is a reasonable potential that one or more new roof <br />systems could offer performance and/or cost advantages, but would add significant <br />load to the existing structure, we would recommend a structural evaluation be <br />conducted. This sumctural evaluation would determine the total load capacity of the <br />existing structure based on the original building drawings. The fee for the structural <br />evaluation would be determined upon review of the original building drawings. <br /> <br />The potential exists for asbestos-containing roofmg materials to exist on this project. <br />Should this be discovered during the field verification work, an asbestos consultant <br />would be required to properly address this concern and we suggest these costs be paid <br />directly by the City of Elk River. <br /> <br /> <br />