My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.0. SR 03-25-1996
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1996
>
03/25/1996
>
8.0. SR 03-25-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:15 AM
Creation date
2/6/2003 4:16:45 PM
Metadata
Fields
Template:
City Government
type
SR
date
3/25/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOW, THEREFORE, IT IS AGREED AS FOLLOWS: <br /> <br /> 1. The City shall prepare the necessary plan, <br /> specifications and proposal which shall constitute "Preliminary <br /> Engineering". The City shall also perform the construction <br /> inspection required to complete the items of work hereinafter set <br /> forth, which shall constitute "Engineering and Inspection" and <br /> shall be so referred to hereinafter. <br /> <br /> 2. The contract cost of the work or, if the work is <br /> not contracted, the cost of all labor, materials, and equipment <br /> rental required to complete the work, except the cost of <br /> providing the power supply to the service pole or pad, shall <br /> constitute the actual "Construction Cost" and shall be so <br /> referred to hereinafter. <br /> <br /> 3. The City with its own forces and equipment or by <br />contract shall install a new traffic control signal with street <br />lights, advance warning flashers and signing on Trunk Highway No. <br />10 at Joplin Street - 185th Avenue in accordance with State <br />Project No. 7102-87. Estimated Construction Cost is $100,000.00. <br />State's share is 50 percent. City's share is 50 percent. <br /> <br /> 4. The State will furnish to the City the State <br />furnished materials to be installed with the City work provided <br />in Paragraph 3. Estimated cost for State furnished materials is <br />$16,000.00. State's share is 50 percent. City's share is 50 <br />percent. <br /> <br />74808 <br /> --3-- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.