Laserfiche WebLink
Development Standards HILLSIDE CROSSING II <br />February 19, 1996 <br />Page Two <br /> <br />high solid cedar wall with a 10 foot green strip with shrubs, trees, and other plantings as shown on <br />Attachments E1 and E2. <br /> <br />Another area which will receive high priority in the initial development phase is the retention pond <br />located in the southeast comer of the plat. This proposed pond will be completed to accept the storm <br />water fi.om the developed site and will be constructed to accomodate the 100 - year rain level. It will <br />be retained with sodded 3:1 slopes with clustered shrubs and ornamental trees. <br /> <br /> <br />