My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INFORMATION #1 04-30-2001
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2001
>
04/30/2001
>
INFORMATION #1 04-30-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:14 AM
Creation date
2/5/2003 9:47:00 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/30/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 <br /> <br />Operator, which plans and materials are the basis for the City's <br />approval of the Conditional Use Permit. <br /> <br />(O3) <br /> <br />The Operator shall orally notify the City of any violations of this <br />permit within 24 hours and follow this with notification in <br />writing within 4 working days of the violation. The operator <br />shall notify the City annually in writing of the total area and <br />amount of material mined and projected estimates of area and <br />amount of material to be mined in the following year. This is to <br />be done at time of hcense renewal. <br /> <br />(O4) <br /> <br />The hcense must be renewed annually and shall run from <br />January 1st through December 31st. The annual license fee is <br />that which is specified by City Code at time of renewal. This <br />license fee is not in lieu of gravel tax collected by the County <br />and a portion of which the City receives. <br /> <br />(05) Violations of this Conditional Use Permit may result in <br /> suspension or revocation. <br /> <br />(06) <br /> <br />The City Building and Zoning Administrator and/or his/her <br />agents shall be permitted to inspect the operation for compliance <br />with the conditions of this permit during normal hours of <br />operation. <br /> <br />(07) <br /> <br />The City's approval of this Conditional Use Permit is subject to <br />the approval of appropriate permits by other governmental <br />agencies. <br /> <br />(08) No explosives shall be allowed for this operation. <br /> <br />(09) .Reclamation <br /> <br />ao <br /> <br />Reclamation shall be implemented on an annual basis <br />pursuant to the reclamation plans submitted by the <br />Operator. <br /> <br />bo <br /> <br />Each year a plan for that year's reclamation shall be <br />approved by the Building and Zoning Administrator prior <br />to issuance of the annual mineral excavation license. <br /> <br />Co <br /> <br />The reclamation shall include top soil from the site being <br />preserved and put back into place after mining. <br /> <br />The vegetation established for the reclamation must be <br />maintained until it is self sufficient. <br /> <br />f:\shrdockb&z\stever\gravcup.doc <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.