My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. SR 09-02-2008
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2008
>
09-02-2008
>
5.3. SR 09-02-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 9:00:00 AM
Creation date
8/29/2008 8:54:55 AM
Metadata
Fields
Template:
City Government
type
SR
date
9/2/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR ACTION <br />To Item Number <br />Ci Council 5.3. <br />Agenda Section Meeting Date Prepared by <br />Administration September 2, 2008 Bill Maertz, Parks and Recreation <br /> Director <br />Item Description Reviewed by <br />Consider Authorization to Contract for Riverwalk Project Lori ohnson, Ci Administrator <br /> Reviewed by <br />Action Requested <br />Authorize staff to contract with American Liberty Construction Inc. for construction of Riverwalk <br />project. <br />Background/Discussion <br />At the May 12, 2008 Ciry Council meeting, the council approved phase one of the Riverwalk project. The <br />estimated construction cost was $69,601. The estimated project cost was below the threshold requiring a <br />public bid. Staff sent the construction documents and bid sheets to 5 qualified contractors experienced <br />with this sort of project. Two quotes were received: <br />American Liberty Construction 5900 Main St., Rockford, MN $69,780 <br />Blackstone Contractors LLC7775 Corcoran Trail, Corcoran, MN $71,018 <br />American Liberty Construction built River's Edge Commons on budget and on schedule. ALC is <br />required to provide insurance and furnish a performance bond. Staff recommends contracting with <br />American Liberty Construction, at a cost of $69,780, for the construction of phase one of the Riverwalk <br />project. <br />Financial Impact <br />Total construction cost of $69,780 to come from the development fund. The Elk River Rotary has <br />committed to reimburse the city $60,000 for this project. <br />Attachments <br />none <br />Action Motion by Second by Vote <br />Follow Up <br />C:\Docuxnents and Settings\jjohnson\Local Settings\Temporary Internet Files\OLK49\5 3 Riverwalk.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.