My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. SR 08-18-2008
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2008
>
08-18-2008
>
5.1. SR 08-18-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2008 2:13:06 PM
Creation date
8/15/2008 2:09:02 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/18/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Show elevations for the sanitary sewer services to the buildings. It appears there <br />is a crossing conflict with the proposed watermain. <br />• Record drawing plans and GIS data will be required on all utilities (private and <br />public) after completion of the construction. Specific information relative to the <br />format can be provided by the Engineering Division. <br />C. Storm Water Calculations <br />• Provide calculations showing the amount of dead storage required and provided <br />in the pond. <br />• Use a Cn of 99 for area of pond up to the 100-year HWL. <br />D. Preliminary Plat <br />• Provide drainage easement for pond <br />• Provide utility easement for sanitary sewer and watermain over Lots 1 and 2. <br />• Provide drainage easement over all of Outlot A <br />• Graphically show easement for Zane Street <br />If you have any questions regarding any of these comments, please contact me. <br />S:\PLANNING MAIN\Case Files\Plat\P 08-08 Zane Street Commons\07 30 08 mgrs comments.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.