My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. SR 08-18-2008
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2008
>
08-18-2008
>
5.1. SR 08-18-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2008 2:13:06 PM
Creation date
8/15/2008 2:09:02 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/18/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Zane Street Commons <br />EIk River, MN <br />P%~. No. ~-714~ <br />` B. Utility Plans . ~ ~ - - . <br />1. Water Connection to Zane Street wilt require a traffic control plan and restoration. of the street . <br />must occur immediately following the connection, including bituminous Patching... ~ . <br />- The Owner will be. responsible fcir obtaining a. detailed twnstruction sigpage and traffic - <br />control pion.. Contractor will be responsible for immediate street restoration and <br />. bituminous patching. <br />2, fond outlet~structure should include a sloped open top, fit into the pond slope as shown in - <br />Standard Plate #2513. The inlet pipe to the control structure should be aminimum-of 12" in . . <br />diameter. If an orifice is needed, it can be built into the interior baffle in the outlet structure. <br />The pond outlet structure will be revised per' Standard- Plate #2513. The orifice: w»U be <br />shown in an interior baffle: - <br />3. Sanitary sewer manhole {SSIvIHi) seems redundant, since the sanitary sewer could connect to <br />the existing manhole by core drilling into the structure. - - <br />SSMH1 is Tieing proposed in order. bo avoid conflict during sanitary sewer construction` with <br />utilities lie: gas; electric, telephone, etc), which may exist along the east property line of the ~ .. <br />site. We are proposi~ to run the sanitar~- sewer some distance. away from; and parallel to; <br />the east property line and then turning about 90 degrees (at SSMHl) to connect with the <br />existing manhole. - <br />4. Show elevations for the sanitary services to the buildings: It appears.there is a crossing <br />conflict with the proposed watermain. ~ . <br />The plans wdl be revised to show sanitary sewer elevations to file buildings.. Elevations will . <br />be adjusted if a conNct exists. ~ . ~ . <br />Record drawing plans and GIS data will be required on all utilities (private and public) after <br />completion of construction. Specific information relative to the format can be provided by the <br />Engineering Division. . <br />The Owner will be responsible for obtaining record drawing plans and GIS data, and ~ . <br />submitting it to the City. ~ . <br />C; Storm Water Calculations <br />1; Provide calculations showing the amount of dead storage required and provided in the pond. <br />Storm water calculaKo~ will be provided showing required and provided dead storage - <br />volumes. <br />2. Use a CN of 99 for area of pond up to' the lOQ-year HWL. ~ - <br />Storm water calculations~wilt be revised to show a CN of 99 within the HWL pond area. <br />Pond.will be adjusted on the grading plan, if necessary. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.