My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. BASR 08-12-2008
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Board of Adjustments
>
BOA Packets
>
2000-2009
>
2008
>
08-12-2008
>
5.1. BASR 08-12-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2008 8:57:11 AM
Creation date
8/13/2008 8:54:01 AM
Metadata
Fields
Template:
City Government
type
BASR
date
8/12/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1,~® -- <br />~~,~~, C <br />~ .~ <br />l <br />350 Hwy. 10 Sauth, Suite 101; St. Cloud, MN 56304 <br />(320) 269-667b • Fax: (320) 259-6991 • www duffyeng.com <br />August 5, 2A08 <br />City of Elk River <br />t3065~Orono Parkway <br />Elk River, MN X5330 <br />Attention: Jeremy Barnhart, AICP <br />Planning Manager <br />RE: I~roposed Zane Street Commons <br />Elk River, MN <br />Proj, N4.OS-714 <br />Below are our responses to the comments forwarded to us from the Elk River City Engineer, <br />dated 07/30/OS. Ourresponses are as follows, and witl graphically appear an the pertinent <br />drawings when submitted for building permit: <br />A. Grading Plan <br />1. Revised pond slopes to match- Standard Plate #2511 <br />Pond will be revised to show pond slopes per Standard Plate #2511. •The standard plate will <br />be included on the plans. <br />2..Provide a 2-foot boulevard between the back of curb and-the retaining wall. <br />Plans will be revised to show Z-foot boulevard. <br />3. Fencing of some type needs tQ be provided on the top of the retaining wall,'due to its height. <br />Fencing to be shown on Architectural plans. <br />4. A retaining wall design will need to be submitted, since the wall is over 4 feet high. <br />The Owner will be responsible for obtaining a retaining wall design from a Structural <br />Engineer, and submitting it to the .City. <br />5. Grading at the northwest corner of the site blocks off the drainage pattern previously in place. <br />install storm sewer to provide an outlet far this area. <br />Plans will be revised to show storm sewer extended to this area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.