My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. BASR 08-12-2008
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Board of Adjustments
>
BOA Packets
>
2000-2009
>
2008
>
08-12-2008
>
5.2. BASR 08-12-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2008 8:51:36 AM
Creation date
8/13/2008 8:50:11 AM
Metadata
Fields
Template:
City Government
type
BASR
date
8/12/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o What are the impacts to the site? Percentage of tree removal, amount of grading, etc? <br />In Phase One, we will be removing (2) trees on City property and one on ours to <br />accommodate a new drive lane and parking. We will be relocating those trees to <br />city property to blend in with the existing tree line that abuts Zane Street. We <br />will also add one tree to the south end of Phase Two that matches the adjacent <br />existing trees. We will also be adding (4) new ornamental trees between <br />Buildings One and Two as shown on our Site Plan. <br />The Amount of grading will be significant. The Site will be stripped and <br />filled to align with adjacent site grading elevations and modified to receive new <br />storm lines and retention pond. Numerous trucks will be hauling dirt away and <br />bringing dirt in along Zane Street. A street sweeper will be on site at all times <br />during the truck traffic times to keep Zane Street clean. Signs will also be posted <br />to notify shoppers and business owners of the increased truck traffic. <br />o Interim Use Permits -what is the duration of request? N/A <br />o What are the reasons for the proposed Ordinance Amendment? N/A <br />o What is the purpose of the Easement Vacation? We will be vacating Utility <br />Easements to allow for the development of the Site. Meetings with Great <br />River Energy have been conducted and a building area been designated as <br />shown on the plans. A formal Vacation is in the works. <br />We will also be seeking to create easements on city property to allow for <br />the proposed parking layout. <br />o What has changed to warrant the Land Use and/or Zone Change? N/A <br />- How is the request consistent with City of Elk River Comprehensive Plan? <br />- How compatible is it with surrounding properties? <br />o Why the rezoning of a development to PUD is being requested? N/A <br />- What are the benefits to the City? <br />
The URL can be used to link to this page
Your browser does not support the video tag.