Laserfiche WebLink
E-2: <br /> <br /> Create a plan that can be built in' phases according to projected <br /> market absorption rates and availability of sewer and water lines. <br /> <br />E-3: Identify sites that may develop as commercial in the near future. <br /> <br />E-4: Identify future uses which may be advantageously located near the <br /> Sherbume County Government Center. <br /> <br />GOAL F <br /> <br />MAXIMIZE THE RETURN ON CAPITAL INVESTMENT IN PUBLIC <br />INFRASTRUCTURE. <br /> <br />9bjectives <br /> <br />F-l: <br /> <br />F-2: <br /> <br />Provide infrastructure which is needed to accommodate and pro- <br />mote development including roadway, storm water management, <br />water and sewer installation. <br /> <br />Create value while investing in infrastructure by doing it in a way <br />that creates additional amenity or improves site character. For <br />example, install landscaping and urban design elements with <br />roadway improvements, or create storm water holding ponds and <br />drainage ways which also serve as open space amenity. <br /> <br />F-3: <br /> <br />Plan for usable public open space in the redevelopment of the <br />Sherbume County Fairgrounds that relates to the Lake Orono <br />Park site. <br /> <br />36 <br /> <br /> <br />