My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5. - 11. ICE 08-06-2008
ElkRiver
>
City Government
>
Boards and Commissions
>
Arena Commission
>
ICE Packets
>
2000-2009
>
2008
>
08-06-2008
>
5. - 11. ICE 08-06-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2008 3:25:40 PM
Creation date
8/4/2008 3:25:40 PM
Metadata
Fields
Template:
City Government
type
ICESR
date
8/6/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
along with the Bleacher funds could be used to complete the lighting project. <br />However, after reviewing several roofing options, it was clear that it was in the best <br />interest of the city to install a roof that would save the city in energy costs as well as <br />last for years into the future. Hopefully the economy will rebound in 2009 and the <br />lighting project can be placed in the 1010 budget. <br />9. High School Coaches Wall of Fame <br />Kent Madsen and I have reviewed the information that we received from Dave <br />Halgren. Kent will be talking to Dave Halgren about confirming the names of the <br />coaches as well as the number of years coaching and their records. Attached for your <br />review are the names of the coaches along with their records and years coached. Kent <br />will be deciding on a design for the plaques and will have his recommendation to the <br />Arena Commission at the November meeting. <br />10. New Zamboni <br />The new Zamboni is still scheduled to be delivered in October. Before it is put into <br />service it will be displayed at Westbound liquor. If we have a sponsor, we will have <br />the graphics placed on the machine before displaying it. This may delay the time line <br />of when it will be displayed and placed into operations. <br />11. Staff Updates <br />A. Dry Floor Events <br />Spaces for the Craft and Home Business Show held in May were again sold out, with <br />the exception of a few out door spaces. However it is taking longer for the show to fill <br />and the quality of crafters is not what it used to be. We are spending more money on <br />soliciting venders for the show than we have had in the past due to the fact there are <br />not as many quality crafters and that the economy is down, which causes the crafters <br />to be more selective in the shows they go to. There will be a time when the craft <br />show will no longer be enough draw to get the attendance needed to have a successful <br />show. The show will have to be expanded into more of a festival, bringing in <br />entertainment and other activities. <br />I've been in contact with Jim Wright, the owner of Crocodile Productions. Crocodile <br />Productions produces trade shows such as Gun and Knife shows. I am hoping that we <br />can schedule a gun show with them for next spring or fall. There is a slight chance <br />that we may even be able to get one in this fall before the ice goes into the Barn. <br />Laura Estby, the Arena's Assistant and I have been working on putting to~ether a <br />classic car show next summer. The tentative date for the show is June 14t . Once we <br />are finished with putting together the preliminary outline of the show we will be <br />asking several organizations and businesses to participate in the show. <br />
The URL can be used to link to this page
Your browser does not support the video tag.