Laserfiche WebLink
Downtown North of Highway 10 Redevelopment Plan Update <br />June 2G, 2006 HRA Meeting <br />Page 2 of 3 <br />Project Background <br />Below is a summary of the HRA's redevelopment planning activities for the area: <br />• Project purpose was defined and the attached work plan was developed <br />• Several previously prepared analyses, plans and other documents were collected <br />including the Interregional Trunk Highway (TH) 10 Corridor Management Plan, a <br />Market Analysis, a Historical Significance Analysis, a Building Condition Analysis, <br />the Elk Rive Comprehensive Plan, the Elk River Transportation Plan Update <br />• HRA developed a Strengths, Weaknesses, Opportunities and Threats (SWOT) <br />analysis for the area <br />• Policy goals and strategies were drafted as part of the redevelopment plan <br />• The attached financial modeling template was developed to begin testing the <br />financial feasibility of sample land uses in Sub-Planning Area 4. <br />Financial Modeling <br />What is financial modeling? <br />Financial modeling is a method to test the financial feasibility of sample land use concepts. <br />This is a starting point for testing the financial feasibility of a redevelopment project. A <br />financial modeling template is meant to test the first in a series of land use concepts for <br />redevelopment. <br />What is the purpose of financial modeling? <br />Financial modeling assists city planners to develop land use concepts based on the financial <br />feasibility of a project. Land use concepts are meant to be refined as financial modeling <br />concepts are refined. <br />How will financial modeling be used for this project? <br />Financial modeling will be used to help determine the following: <br />Cost estimates for a redevelopment concept <br />Estimated Tax Increment Financing (TIF) for redevelopment <br />Estimate of the financial gap between costs and TIF <br />Preliminary Redevelopment Gap Analysis <br />Summary <br />The attached preliminary gap analysis indicates the different ranges of financial gaps that <br />would need to be filled, whether it be through TIF, grants, low-interest loans, etc., in order <br />to make the sample land use concepts feasible in Sub-Planning Area 4. For instance, the <br />financial gap for the current Downtown Revitalization Project was filled by the usage of Tax <br />Increment Financing TIF, reducing the sale price of the land and deferral of SAC and WAC. <br />Redevelopment is a complex and expensive process in which property is most often <br />purchased at above market value prices even though the buildings will be removed. <br />S:\Downtown North of Hwy 10\Memos\2006\G-2G-OG.doc <br />