My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. SR 02-26-1996
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1996
>
02/26/1996
>
5.3. SR 02-26-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:12 AM
Creation date
1/22/2003 9:46:32 PM
Metadata
Fields
Template:
City Government
type
SR
date
2/26/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSULTING ENGINEER <br /> <br />1326 Energy Pa& Drive <br /> <br />St. Paul, MN 55108 <br /> <br />612-644-4389 <br /> <br />1-800-888-2923 <br /> <br />Fax: 612-6~-9446 <br /> <br />January 17, 1996 <br />File: 230-296-! 1 <br /> <br />Mr. Steve Ach <br />City Planner <br />City of Elk River <br />13065 Orono Parkway <br />P.O. Box 490 <br />Elk River, MN 55330 <br /> <br />RE: DAN BOMAN PROJECT <br /> <br />Dear Mr. Ach: <br /> <br />CIVIL ENGINEERING: <br />ENVIRONMENTAL <br />MUNICIPAL <br />PLANNING <br /> <br />SOLID WASTE <br />STRUCTURAL <br />SURVEYING <br />TRAFFIC <br />TRANSPORTATION <br /> <br />ELECTRICAL/MECHANiCAL <br />ENGINE[RING: <br /> <br />HVAC <br /> <br />POWER DISTRIBUTION <br /> <br />SCADA <br /> <br />SYSTEM CONTROLS <br /> <br />OFFICES IN: <br /> <br />MINNEAPOLIS <br /> <br />PRIOR LAKE <br /> <br />ST. PAUL <br /> <br />WASECA <br /> <br />As you are aware, we have had a number of meetings with Mr. Boman and representatives <br />of his engineering company to discuss issues on his proposed plat. The plat is located in <br />the central portion of the City and consists of approximately 110 acres divided into 10 <br />residential lots. Through this series of meetings, we have been able to address many of <br />the issues regarding this plat. <br /> <br />The three major issues that we have resolved through these meetings are the number and <br />size of the lots proposed, the extension of the bituminous roadway entirely through the plat <br />to its western border, and the wetland filling and mitigation plan. In fact, on January 2, <br />1996, the Technical Advisory Committee met to review the wetland mitigation proposal <br />and found no problems with it. Therefore, this wetlands plan is working its way through <br />the process. <br /> <br />In the future, we will need some information relative to grading on the site, although it is <br />not very critical with the size lots proposed. We will also need specific storm drainage <br />calculations and a street design, especially through the eastern edge of the plat where the <br />street is through wetlands to be filled. The County should be contacted regarding <br />additional right-of-way on Anoka County 24. Also, in the northwest we talked about <br />adding additional right-of-way to preserve trees. <br /> <br />I see no problems with this development moving through the Planning Commission and <br />then the Council in its preliminary form. If you have any questions regarding this project, <br />please call. <br /> <br />Sincerely, <br /> <br />MSA, CONSULTING ENGINEERS <br />T~rer, P.E. <br /> <br />TJM:tw <br />296-1709.jan <br /> <br />An Equal Opportunity Employer <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.