Laserfiche WebLink
C. Projects and Summer Repairs <br />The center groove project in the Barn is on one of it's last phases, on the wall of the <br />new Zamboni and Compressor room. The project should be complete sometime in <br />June. <br />A couple of compressors are due for their annual maintenance. Their shaft seals will <br />be replaced and their Top ends overhauls. This work will be done throughout the <br />summer to make sure that the Olympic rink operates without interruptions. <br />The snow melt pit will be looked at to see if we can get the water temperature up so <br />that snow will melt during the season. Right now the snow builds up and hot water <br />from the water heater has to be used to melt the snow (very wasteful) and the snow <br />has to be moved around with a shovel to get it into the pit. Besides the expense of <br />heating the water, my main concern is that someone is going to hurt their back when <br />breaking up the snow to get it into the pit. We may have to hire an Engineer to find <br />out what the best solution to the problem. <br />Most of the rink will see a new fresh coat of paint to cover the stick and puck marks <br />from over the season. Some of the other minor repairs will be, re -landscape the <br />front area, install a new toilet bowl in men's bathroom, repair and caulk worn-out <br />joints around the rink area, clean the boards and glass in the Barn, and connect sub <br />floor heat coils to the threshold in the Barn to the heating system. There is a variety <br />of other small projects scheduled as well. <br />