Laserfiche WebLink
NAME: <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />RESULTS AS OF 02/03/96 <br /> 59 of 89 Returned <br /> <br />RIVERVIEW HEIGHTS QUESTIONNAIRE <br /> <br />ADDRESS: <br /> <br />What year was your home built? <br /> <br />What is the condition of your septic system'? <br />Good 45 Fair 4 Showing signs of failure 6 <br /> <br />Don't know 2 <br /> <br />When was your septic system last upgraded? <br />More than 10 years 15 5-10 years 14 <br /> <br />0-5 years 15 <br /> <br />Don't know 11 <br /> <br />What is the condition of your well? <br />Good 45 Fair 7 Showing signs of failure 0 <br /> <br />Don't know 4 <br /> <br />When was your well last upgraded? <br />More than 10 years 13 5-10 years 19 <br /> <br />0-5 years 11 <br /> <br />Don't know 12 <br /> <br />How is the storm drainage in your neighborhood? <br />Adequate 50 Needs improvement 6 <br /> <br />How is the condition of the streets in your neighborhood? <br />Adequate 15 Needs some work 21 Needs major work 22 <br /> <br />Your street is scheduled for overlayment in 1996. The estimated cost is $1,750 to $2,000 <br />per property. The useful life of an overlay is 8 to 12 years, during which utility <br />construction would likely not be considered. Would you prefer that utilities and new street <br />construction be looked at and discussed prior to considering an overlay project? <br /> <br />Consider utilities and new street prior to overlayment. 19 <br />Just consider an overlay project. 34 <br /> <br />Given the financial information contained on the attached sheet, are you in favor of a <br />neighborhood information meeting to further discuss this issue with the City? <br /> <br />Yes 37 No 19 <br /> <br />Additional Comments: <br /> <br />If you have any questions or would like to talk to somebody directly, please contact Terry <br />Maurer, City Engineer, at 6444389. <br /> <br />230/286-2514.sep <br /> <br /> <br />