My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. PCSR 06-10-2008
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2008
>
06-10-2008
>
5.1. PCSR 06-10-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2008 2:08:27 PM
Creation date
6/19/2008 2:08:26 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
6/10/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Case File: CU 08-I] <br />Pagc 2 <br />Attachments <br />Location Map <br />Memo from Public Works Director dated May 20, 2008 <br />Memo from Sherburne County Public Works dated May 13, 2008 <br />Memo from Fire Chief dated May 20, 2008 <br />Applicant's Narrative <br />Site Plan(s) <br />Architectural Drawing(s) <br />General Information <br />Spectrum High Schoo] <br />CticP Properties <br />A licant C&P Properties <br />60 Day Rule The application has been deemed complete as of May 8, 2008. <br />The City must take action by June 28, 2008 <br />Re nested Action Interim Use Permit for Temporary Class Rooms <br />Location and Size Spectrum High School <br />Location Existing Use Land Use Plan Designation Current Zoning <br />$Ubjeet <br />Property Residential Urban Residential R1d Single Family <br />NOrth Residential Urban Residential R1d <br />SOUth Residential Urban Residential R1c Single Family <br />East Residential Urban Residential PUD <br />West Residential Urban Residential R1d <br />Overview <br />Spectrum High School., as part of their Interim Use Permit (IUP), wishes to install a 6,860 square <br />foot temporary modular building for classrooms. The building will be located west of the future <br />proposed high school along the west property line, and southwest of the existing modular building. <br />It is the understanding that the current enrollment is approximately 130 students. They need the <br />second unit in order to reach an enrollment of 285 st<l.dents; at this point the school can bond for <br />construction for a permanent building. This is the number of students that was discussed with the <br />original IUP from July 18, 2007. <br />S:\PLANNING MAIN\Case I~ilcs\CUP\CU 08-11 Spectrum (C and P Prop)\CU 08-11_FC.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.