My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. PCSR 06-10-2008
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2008
>
06-10-2008
>
5.1. PCSR 06-10-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2008 2:08:27 PM
Creation date
6/19/2008 2:08:26 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
6/10/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RIVERSIDE <br />~~~~~~~ <br />Riverside Development Company <br />Pioneer Investments, LLC <br />LC Development, LLC <br />Apri128, 2008 <br />City of Elk River -Planning Department <br />13065 Orono Parkway <br />Ells River, MN 55330 <br />Phoenix Enterprises, LLC <br />CM Points Holdings, LLC <br />Franklin Development Inc. <br />RE: 2009 Spectrum High School Expansion -Project Narrative <br />In May of 2007, the City of Elk River granted Spectrum High School an Interim Use <br />Permit to operate their educational facility at 10129 181St Avenue NW in Elk River. <br />The school currently operates out of a modular building. In order to reach an <br />enrollment of 285 students (the point at which the school can bond for construction of <br />the permanent building), a second set of modular classrooms needs to be added to the <br />site. The enrollment at the school is increasing and the City's sunset date to occupy the <br />permanent building is very attainable. <br />Spectrum Charter High School operates like any other educational facility. Hours of <br />operation are typically 8:00 am to 3:OOpm -with some extra curricular activity traffic. <br />The anticipated enrollment for the 2008-2009 school year is 180-200 students. It is <br />estimated that 25% of the enrolled students would be drivers -along with 25 staff <br />members. The maximum enrollment is projected at 500 students for grades 8-12. An <br />estimate of 50 staff members will be needed to accommodate the projected enrollment. <br />The Preliminary Site Plan demonstrates meeting parking requirements for the interim <br />use with the addition of 28 parking spaces along C.S.A.H. No. 12. The educational use <br />of this property staggers the traffic patterns and may relieve some peak traffic-flow <br />time periods. <br />The Preliminary Site Plan demonstrates how well the school preserves the natural <br />features of this parcel. The property is environmentally very sensitive. The existing <br />modular facility and parking area is located closer to C.S.A.H No. 12 -away from <br />Trott Brook. The proposed modular classrooms are located south and west of the <br />existing modular building -even further away from Trott Brook. The site plan <br />demonstrates meeting the setback requirements for building and parking in an Rld <br />zoning district. All construction is proposed outside of the current Flood Plain with no <br />wetland mitigation needed and minimal tree impact. <br />A soils report prepared by ITT dated June 16, 2000 suggests typical construction <br />practices with spread footings for building foundations and a R-30 pavement section <br />(1.5/2/10-7 ton and 1.5/3/12-9 ton). The subsurface water table was observed between <br />5 and 8 feet. The school is currently served with city sewer and water. The expansion <br />COMPANIES <br /> <br /> <br />19230 Evans Street NW' Suite 115 ~ Elk River, MN 55330 <br />Phone: 763-241-1801 ~ Fax: 763-241-1399 <br />
The URL can be used to link to this page
Your browser does not support the video tag.