Laserfiche WebLink
which would again allow some variation from the policy without setting a <br />long term precedent. <br /> <br />The procedure I would propose is to have the grader pull the snow from under <br />the mailboxes and out into the street, the loader and big blower to blow the <br />snow onto the boulevard, and a truck plow coming behind to clean up. I <br />estimate that it will take 5 to 7 working days to cover the city. <br /> <br />The cost for this operation is about $100 per hour for equipment and $60 per <br />hour for labor or a project total of $5,600 for equipment and $3,360 for labor. <br /> <br />A long term solution to 95 percent of the mailbox problems would be city <br />approved mailbox standards on larger lots and clustered mailboxes on small <br />lots and in cul-de-sacs. I would be happy to help develop a program if the <br />Council so desired. <br /> <br />I request Council direction on these two situations. <br /> <br />s:kcouncilksnowevnt, doc <br /> <br /> <br />