Laserfiche WebLink
o Is these outdoor storage? `Ylhat is being stored? Ho~v much? Proposed screening? No <br />outdoor storage other than a trash enclosure which will have materials to match <br />the building exterior. There will be one shared trash enclosure for phase one and <br />one shared trash enclosure for phase two. <br />o What are the impacts to the site? Percentage of tree removal, amount of grading, etc? <br />In Phase One, we will be removing (2) trees on City property and one on ours to <br />accommodate a new drive lane and parking. We will be relocating those trees to <br />city property to blend in with the existing tree line that abuts Zane Street. We <br />will also add one tree to the south end of Phase Two that matches the adjacent <br />existing trees. We will also be adding (4) new ornamental trees between <br />Buildings One and Two as shown on our Site /Landscape Plan. ' <br />The Amount of grading will be significant. Parcel One /Phase One will be <br />stripped and filled to align with adjacent site grading elevations. Parcel One / <br />Phase Two grades to be modified as necessary to receive new storm lines tied to <br />a retention pond on Parcel Two. Numerous trucks will be hauling dirt away and <br />bringing dirt in along Zane Street. A street sweeper will be on site at all times <br />during the truck traffic times to keep Zane Street clean. Signs will also be posted <br />to notify shoppers and business owners of the increased truck traffic. <br />o Interim Use Permits -what is the duration of request? N/A <br />o What are the reasons for the proposed Ordinance Amendment? N/A <br />o What is the purpose of the Easement Vacation? We will be vacating Utility <br />Easements to allow for the development of the Site. Meetings with Great <br />River Energy have been conducted and a building area been designated as <br />shown on the plans. A formal Vacation is in the works. <br />' We will also be seeking to gain easements on adjacent properties to <br />accommodate a retention pond access point between Parcels One and Two in <br />Phase (One) and easement to allow for an additional drive aisle as shown on <br />the plan. Easements will also be obtained for underground utilities on the <br />property. <br />o What has changed to warrant the Land Use and/or Zone Change? N/A <br />- How is the request consistent with City of Elk River Comprehensive Plan? <br />- How compatible is it with surrounding properties? <br />o Why the rezoning of a development to PUD is being requested? N/A <br />- What are the benefits to the City? <br />