Laserfiche WebLink
i <br />Stearns Co. West Side Service Center <br />Waite Park, IvIN <br />Proj. No. 08-702 <br />We will revise our plans as necessary to incorporate applicable City standards. The Owner <br />will be responsible for including any required easements in the platting of the property. <br />7. Final review of hydrant spacing for fire protection will be accomplished at the final plan <br />review and will involve the Fire Chief. <br />We will revise our plans if necessary with regards to Hydrant spacing. <br />8. There will be a requirement to provide record drawings including GIS data of the <br />constructed utilities including sanitary sewer, watermain and storm sewer after completion of the <br />improvements. The GIS data must include field surveyed locations (X, Y;Z} of all utilities on the <br />County coordinate system. <br />The Owner will be responsible for providing record drawings to the City per City <br />requirements. <br />9. It is important to note that there will be engineering fees during the construction of the <br />site as the public watermain and sanitary sewer will inspected, along with monitoring of the <br />erosion and sediment control facilities. <br />Owner will be responsible for fees and monitoring of erosion and sediment control devices. <br />Please call me if you have any questions. <br />Duffy Engineering & 4ssociates, Tnc. <br />-°.: ~/~ <br />Brian J. Schultz, PE <br />Civil Engineer <br />C: File <br />