Laserfiche WebLink
REQUEST FOR ACTION <br />To Item Number <br />Ci Council 6.3.A. <br />Agenda Section Meeting Date Prepared by <br />Administration une 16, 2008 Lori ohnson, Ci Administrator <br />Item Description Reviewed by <br />193`d Avenue Corridor Update -Pathway Options <br /> Reviewed by <br />Action Requested <br />Consider deleting a portion of bituminous pathway proposed on the south side of the 193`d Avenue east <br />of Xavier Street continuing to Tyler Street. <br />Background/Discussion <br />Throughout the process of determining the location of the 193`d Avenue extension, the City Council has <br />been very responsive to the requests and concerns of Mr. and Mrs. Burandt, who are property owners on <br />the south side of the 193`d Avenue extension. The Council and staff have been working with the Burandts <br />on the temporary easement needed to accommodate the addition of a bituminous pathway along the <br />south side of 193"' from Xavier Street to County Road 13. At the last meeting, the Council directed staff <br />to send a letter to Mr. and Mrs. Burandt with the City's proposal for compensation options for the <br />temporary easement. However, since that time, another option has come to light that staff is presenting <br />for your consideration. The attached memo from Public Works Director Terry Maurer provides <br />additional detail information. <br />The option staff is asking the Council to consider in order to elitxunate any impact on the Burandt <br />property is to delete the section of pathway from Tyler Street to Xavier Street thereby eliminating the <br />need for a temporary easement from Mr. and Mrs. Burandt. There will still be pedestrian facilities along <br />the entire length of 193`d from Hwy 169 to County Road 13 via a sidewalk on the north side; part of that <br />sidewalk was constructed with development along the existing 193`d Avenue and the balance will be <br />constructed with the extension of 193`d. City policy has been to add pathways along with sidewalks <br />whenever possible. However, given the slope of many of the existing driveways on the south side of <br />193`d and the fact that development has already occurred along the existing part of 193`d, it is difficult to <br />add a pathway west of Xavier Street. For that reason, and because a sidewalk will be available on the <br />north side to provide a safe means for pedestrians, extending the pathway from Xavier to Hwy 169 is not <br />being proposed at this time. Therefore, eliminating the section of pathway along the Burandt property is <br />not critical to the pathway system at this time. It could always be added in the future if that property is <br />developed. <br />S:\Council\Lori\2008\Pathway Options.doc <br />