Laserfiche WebLink
Case File: CU 08-11 <br />Page 4' <br />Spectrum High School <br />C&P Properties <br />Storm Sewer/water -Storm water falling on the parking lot will sheet drain to a low. ditch on the <br />west side of the property, and flow overland to a storm pond north of the modular building. <br />Landscaping <br />The applicant planted a row of thirteen autumn blaze maple trees along CSAH 12. They are <br />proposing to add 12-feet of bituminous, giving parking stall depths of 20-feet. The bituminous <br />surface would be 5-feet from the trees. The stalls could be reduced to 18 '/a -feet to provide more <br />area from the bituminous surface to the trees and be consistent with the ordinance. <br />As this is a temporary use, it is suggested that more attention to the landscaping be part of the <br />Conditional Use Permit for the permanent building. <br />Safe <br />During severe weather, a 70 x 40 concrete block building east of the modular building has been <br />constructed and will be retained. <br />Action Motion by Second by Vote <br />Follow Up <br />S:\PLANNING MAIN\Case Files\CUP\CU 08-11 Spectrum (C and P Prop)\CU 08-11_PC.doc <br />