Laserfiche WebLink
Xl. SUMMARY AND RECOMMENDATIONS <br /> <br />This project is feasible from an engineering standpoint. It is necessary and cost-effective <br />for a number of reasons. Extending the sanitary sewer down Concord Street and <br />Boston Street will replace on-site septic systems on relatively small lots. The watermain <br />improvements will connect to the existing water system at multiple locations thus <br />providing the benefit of a looped system. Updating the street to an urban roadway with <br />concrete curb and gutter will promote adequate storm drainage and bring these streets <br />up to city standards. The proposed improvements will be developed into a project large <br />enough to ensure a competitive bidding process. Therefore, the proposed <br />improvements will be cost-effective. <br /> <br />It is recommended the City accept this feasibility report as presented herein for the <br />improvements as recommended and adopt the proposed schedule calling for a Public <br />Hearing on February 10, 2003. <br /> <br />7 <br /> <br /> <br />