My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3. SR 01-13-2003
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2003
>
01/13/2003
>
6.3. SR 01-13-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:10 AM
Creation date
1/13/2003 8:31:47 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/13/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
assessment manual, the overhead costs have been estimated at 28% of the total <br />construction cost. The overhead cost includes City administration, engineering design, <br />construction staking and inspection, and fiscal and legal costs. <br /> <br />Table 1 <br /> <br /> Project Cost Estimate <br /> <br />Sanitary SewerNVater/Restoration <br /> <br />Upgrade to Urban Street Section with Storm Sewer <br /> <br />Total Construction Cost <br /> <br />Administration, Engineering, Fiscal, & Legal <br /> <br />Contingency (5%) <br /> <br />Total Project Cost <br /> <br />$276,5OO <br /> <br />$ 68,5oo <br /> <br />$345,000 <br />$ 97,000 <br />$ 17,500 <br />$459,500 <br /> <br />VIII. FINANCING <br /> <br />Financing methods for the proposed improvements on Boston Street and Concord Street <br />are based on the City's Assessment Manual and past practices. They will include <br />proposed assessments for sanitary sewer, water and restoration improvements to those <br />properties abutting Boston Street, Concord Street and Mississippi Road that have not <br />been previously assessed. As has been the City's past practice when City utilities are <br />extended into a neighborhood, the reconstructed streets on Boston Street and Concord <br />Street are proposed to be built to the City Urban Standard, including concrete curb and <br />gutter and storm sewer. The cost of the street reconstruction beyond restoration of the <br />existing section is proposed to be funded by the City as has been the policy established <br />in other similar projects. It is recommended the City Street Reserve Fund be used for <br />this portion of the financing. The amount is estimated to be $92,000. <br /> <br />IX. ASSESSMENTS <br /> <br />As stated previously, it is proposed to assess the cost of the sanitary sewer, water and <br />restoration improvements to those properties on Boston Street, Concord Street and <br />Mississippi Road not previously assessed for City utility service. The portion of the <br />project cost to be assessed is estimated at $367,500. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.