My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.3. SR 01-16-1996
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1996
>
01/16/1996 - SPECIAL
>
7.3. SR 01-16-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:09 AM
Creation date
1/8/2003 8:38:18 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/16/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
?age <br /> <br />4.) <br /> <br />(17) <br /> <br />Mining activities shah not cause excessive vibration off site. If <br />excessive vibration becomes an issue, the City reserves the right <br />to take appropriate measures to alleviate the problem. <br /> <br />(18) Groundwater protection measures shah include: <br /> <br />ao <br /> <br />The operator shah file with the City an emergency spill <br />response plan. The operator shah adhere to this plan in <br />the event there is a spill. <br /> <br />bo <br /> <br />The operator shah provide the Fire Department with a <br />copy of their flammable or hazardous materials. <br /> <br />Co <br /> <br />Fuel tanks shaH' be above ground, properly diked (ii' <br />required by law), and registered with MPCA. <br /> <br />do <br /> <br />All incidences that have the potential to adversely affect <br />groundwater, including but not limited to spills, shah be <br />verbally reported to the City within 24 hours. This verbal <br />notification shall be followed up in writing within 4 <br />working days. <br /> <br />eo <br /> <br />Gravel wash operations shah be prohibited on the <br />property. <br /> <br />Mining operations shah be conducted a minimum of five <br />(5) feet above the seasonally high water table. <br /> <br />g° <br /> <br />The appropriate storm water permit shall be obtained by <br />the operator from MPCA. <br /> <br />(19) Fencing - The entire perimeter of the property shah be fenced. <br /> <br />(20) Screening and Buffering No mining operations shah be <br />conducted within two hundred (200) feet of the property boundary. <br />Further, within this two hundred (200) foot buffer area trees shall be <br />left for screening. In open areas where trees do not exist, screening <br />shall be accomplished by the construction of a minimum six (6) foot <br />high berm planted with evergreens. <br /> <br />,General Provisions- <br /> <br />(01) Permits- Operator agrees to comply with all of the provisions <br />hereof and agrees to save and hold the City harmless from any and all <br /> <br />cupST-Ba/bz~sr <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.