My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2. SR 01-16-1996
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1996
>
01/16/1996 - SPECIAL
>
7.2. SR 01-16-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:09 AM
Creation date
1/8/2003 8:35:58 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/16/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All utility and street construction plans and specifications as presented by the <br />Permittee for the Facility and servicing streets must be prepared by a <br />Registered Civil Engineer in accordance with directions of and as approved by <br />the City Engineer. <br /> <br />All building plans and specifications must be approved by the City Building <br />Inspector and Fire Chief. <br /> <br />Approval of driveway entrances or exits, if needed, on State and County <br />highways shall be secured from the appropriate agencies and filed with the <br />City Zoning Administrator prior to issuance of any building permit. <br /> <br />The City shall have the right of access to the Facility and site. The City need <br />not give prior notice to the Permittee for designated personnel to access the <br />Facility or site during the hours of 6:00 a.m. to 6:00 p.m., Monday through <br />Saturday, or if any emergency occurs. At any other time, at least twelve (12) <br />hours prior notice to the Permittee is required. Such access shall be in <br />accordance with the Permittee's safety standards and proprietary information <br />requirements, and shall not interfere with the Permittee's ability to perform its <br />contractual obligations. <br /> <br />All employee or visitor motor vehicles associated with Facility operation shall <br />be parked on Facility property or on adjacent property owned by the <br />Permittee, but not on adjacent lands not owned by Permittee or on adjacent <br />streets. Adequate facilities must be provided to ensure that no vehicle <br />delivering RDF to the Facility will have to wait outside the perimeter of the <br />Facility site. <br /> <br />ge <br /> <br />The City shall be notified by the Permittee immediately upon the release or <br />· spill of hazardous materials at the Facility; and of any violations of the <br />conditions of the Permit, Air Emission Facility Permit No. 147A-86-0T-1, or <br />Permit for a Waste Processing Facility and System, No. SW-305 and NPDES <br />Permit No. MN001988. <br /> <br />This Permit authorizes burning at the Facility of up to 1,050 tons per day of <br />RDF as a monthly average. <br /> <br />10. <br /> <br />Ail RDF and Ash-hauling truck traffic must enter the Facility site directly <br />from Highway 10, Highway 169, or UPA Drive; and must exit the Facility <br />directly onto Highway 169. RDF hauling trucks shall not enter or exit the <br />Facility during the hours of 4:00 p.m. to 6:30 p.m. any day. All ash or other <br />haul trucks leaving the Facility shall be securely covered so that no ash, or <br />other particulate matter may escape. <br /> <br />PXB 102965 2. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.