My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.11. SR 01-16-1996
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1996
>
01/16/1996 - SPECIAL
>
5.11. SR 01-16-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:09 AM
Creation date
1/8/2003 8:33:44 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/16/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 11, 1996 <br /> <br />Mr. Pat Klaers <br />City Administrator <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, Mn. 55330 <br /> <br />SUBJECT: HILLSIDE CROSSING II <br /> <br />Dear Pat, <br /> <br /> I am writing this letter of request regarding the design and plans for this proposed <br />commercial development. The engineering firm ofM S.A. has had extensive involvement in the <br />design of the infrastructure and drainage throughout the HILLSIDE CROSSING project. <br />All previous design that was done factored in the future commercial uses with respect given to <br />location and calculated sizing of Sanitary Sewer, Watermain, Surface Drainage, and Storm Sewer. <br />This work was performed by M.S.A. <br /> Because of M. S.A.'s knowledge of the design features, I would like the city to consider <br />my request to have M.S.A. design and provide the plans for the Grading Plan for common <br />excavation. The grading and drainage is directly connected to the Storm Sewer location and <br />design which will be done by MS.A. I feel it would be unwise and time consuming to throw <br />another engineering firm into the pot. Another engineering firm would have to familiarize their <br />staff with design already completed and installation inspected by M.S.A. Calculations for future <br />projects that are dependant upon the completed drainage design and infrastructure has also been <br />completed by M.S.A. <br /> It is for these reasons that I am asking the city to allow us to have M.S.A. produce the <br />Grading Plan for common excavation. The detailed elevation plans will be part of each site plan <br />submittal and will be done by that applicant's engineer. <br /> Thank you for considering this request. <br /> <br />Respect~ su, b~_~t.~? <br /> <br />Richard Foster <br />Phoenix Enterprises, L.L.C. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.