Laserfiche WebLink
<br />TABLE 3 ESTIMATED ASSESSMENT RATE FOR POSSIBLE URBAN SERVICE AREA <br />CITY OF ELK RIVER <br />MSA CONSULTING ENGINEERS <br />APRIL 1995 <br /> <br /> Estimated Estimated Total Construction Net Assessable Estimated <br />Area Sewer Construction Watermain Construction Cost Acreage Assessment Rate <br /> Cost ($) Cost $ $ $/acre) <br /> <br />East T.H. 10 Primary Study Area 3,834,000 3,537,000 7,371,000 1,353 5,447.89' <br />Steering Committee Proposed Area 2,703,000 2,843,000 5,546,000 850 6,524.71 <br />