My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3. SR 05-25-1995
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1995
>
04-25-1995 SP
>
3. SR 05-25-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2008 3:47:26 PM
Creation date
5/12/2008 3:47:03 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/25/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDEPENDENT <br />CONSULTING <br />ENGINEERS, INC. <br />April 9, 1995 <br />A. Lemberg, P.E., President <br /> <br />Mr. Pat Klaers <br />City Administrator <br />City of Elic River <br />Re: Proposed Revisions to Contract <br />Professional Services on Ice Skating Facility <br />City of Elk River <br />File No. 230294 <br />Dear Pat, <br />APR f ~ <br />80 W. County Road C <br />Little Canada <br />St. Paul, Minnesota 55117 <br />Suite 801 <br />PHONE: 612-482-9313 <br />FAX: 612-482-9558 <br />Due to our recommendation to you on engaging the services of <br />Construction Manager for the Elk River Ice Arena Expansion Project <br />and based on our conversations both with you and with the Arena Task <br />Force, we submit the following proposed revisions to our present <br />contract based on our original "Proposal 'A "' dated .August 26, 1994. <br />1. Delete the following from the Proposal 'A' letter: "Modified <br />Project Coordination/Construction Management &" thus leaving <br />Consulting and Design Services. <br />2. In paragraph 2, delete the words "Project Coordination/ <br />Construction Management and" <br />3. Under Phase III - Design Development, delete item III-D <br />4. Under phase Iv - Construction Documents <br />Change as follows: <br />A. Work with Task Force and A/E on review of final design <br />and development of detailed bid documents including <br />plans and specifications pertaining particularly to ice <br />rink design, refrigeration system design, dasherboard <br />design, and provide consulting service/recommendations <br />or floor plan layout, dehumidification ventilation and <br />lighting. <br />B. Attend periodic meetings with A/E for final plan and <br />specification coordination. <br />C. Leave as is <br />®I.C.E., Inc. 1995 Proposed Revisions <br />• City of Elk River page - 1 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.