Laserfiche WebLink
nstriui~g Inc. <br />Solutions Built with Valua, Service & lnlegrity" d <br />11751 Troy Lane Mort <br />Maple Grove, Minnesota 5536 <br />763.493.3000 office 763.428.3954 fe <br />877.493.3001 Io0 fre <br />EMA1L xsE i i<n iruaiym..em <br />WEn SITG envU:~wiinc.tpn'~ <br />Date: April 29"', 2008 <br />Jeremy Barnhart, Council and City Administrator, <br />Re: Roof top screening ak the Aldi lacatian in Elk River <br />It is with great regretthat I need to write this letter. Our intentions were to have this issue resolved, <br />as I know you wish it was. The information that we are receiving from our secondary subcontractor <br />is that the screening for the Aldi location in Elk River will be shipping around May 0Th, 2008. <br />We have received many different dates from our subcontractor and have made arrangements, not <br />only to track this shipment, but to have installers standing by to achieve the installation as soon as <br />the product arrives. If for some ~easoh we see this shipment being delayed yet again, we would like <br />to suggest a temporary screening,. if necessary, to secure the Aldi store status of remaining open. <br />Wifh this plan, we would start the instal[ of a temporary screening on the 19`" so that we are <br />completed with the temporary screening by the 30th of May. This temporary screening would be of <br />material that can be easily instaNed and disassembled without compromising the roofing. To <br />achieve this goal, the temporary screening would need to be attached in the same manner as the <br />.permanent screening would be installed. By attaching to the screening to Roof top units <br />themselves. <br />In closing, we at VSI wouldlike to extend to our most sincere apologies, and will continue to do <br />whatever is required to resolve this matter in the timely fashion possible. <br />VP of Corporate Operations <br />VSI Construction, Inc. <br />612.919.4754 <br />bround s@vsiconstruction.com <br />An Equa! Opportunity Employer/Oontroetor <br />