My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. SR 05-05-2008
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2008
>
05-05-2008
>
5.1. SR 05-05-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2008 9:43:32 AM
Creation date
5/2/2008 11:15:22 AM
Metadata
Fields
Template:
City Government
type
SR
date
5/5/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GREAT RIVER ENERGY <br />Elk River Peaking Station May 5, Zoos <br />Heavy Haul <br />Two large critical pieces of equipment will be delivered via railroad to Great River <br />Energy's site. The heavy equipment delivered includes: <br />Combustion Turbine <br />0 475,000 pounds <br />o Delivery from: Hamilton, Ontario <br />Generator <br />0 600,000 pounds <br />o Delivery from: Charlotte, North Carolina <br />The current location for the rail off loading has been sited at T.J. Potter Trucking <br />Company located in Becker, MN. <br />The current schedule for the delivery to Becker Rail Spur: <br />o Combustion Turbine Delivery Date: Approximately May 29, 2008 <br />o Generator Delivery Date: Late June, 2008 <br />Vic's Heavy Haul Company has been hired by GRE to perform both heavy hauls from <br />Becker to Elk River. <br />The heavy haul road path will start from Becker's siding just off of Liberty Lane and Hwy <br />10, continue on Liberty Lane to 140th Ave SE, run east on 15Th Street, and turn south <br />on Park Blvd SE which turns into CR-14. From CR-14, the heavy haul will continue to <br />CR-30 and then turn into Mississippi Rd NW in Elk River, which turns into Main Street. <br />Then, the heavy haul will get off Main Street at 4'h St NW and onto Railroad Drive NW. <br />The heavy haul will continue on Railroad Drive NW which will lead into Great River <br />Energy's Campus. <br />Along Mississippi Rd NW which turns into Main St, a bridge near City of Elk River <br />Utilities Maintenance Buildings will need to be crossed during the heavy haul for both <br />pieces of equipment. GRE received approval by the City of Elk River Engineer and <br />Street Department to conduct a bridge review that would evaluate the bridge's capacity <br />and make recommendations to equipment required to cross the bridge. <br />GRE has coordinated with Vic's Heavy Haul Company and Earth Tech to perform a <br />bridge engineering rating review. The review has been completed by Earth Tech and <br />returned a positive rating for this bridge and the heavy haul loadings. <br />2of4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.