My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3. SR 02-12-2001
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2001
>
02/12/2001
>
4.3. SR 02-12-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:06 AM
Creation date
12/30/2002 7:53:54 PM
Metadata
Fields
Template:
City Government
type
SR
date
2/12/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Gary Leirmoe <br />January 22, 2001 <br />Page Two <br /> <br />The upper level of the digester building will be physically separated from the gas-handlir~g equipment <br />as defined by NFPA 820. Therefore, it will require only 6 ac/hr of continuous ventilatior) to become <br />unclassified per the NEC, <br /> <br />Based on these recommendations, additional work will be required. The additional work is summarized as <br />follows: <br /> <br />1. Physical separation of the upper and lower level; <br /> <br />This wilt require excavation for a new entry into the lower level, as well as removing the existing <br />stairway and closing off the stairway floor opening. The grate between the upper and lower level must <br />be removed. If an.opening is required for removal of pumps, the grate should be replaced with a <br />gasketed, gas-tight cover. All remaining penetrations should be sealed to be gas-tight. <br /> <br />2. Lower Level: <br /> <br />This will require a new heated make-up air unit and exhaust fan to provide 12 ac/hr c.f continuous <br />ventilation. In addition, electrical wiring and devices will have to be changed to bring the area into <br />compliance with Class 1, Division 2 per the NEC. <br /> <br />3. Upper Leveh <br /> <br />This will requi~e a new heated make-up air unit and exhaust fan to provide 6 ac/hr of continuous <br />ventilation. This room will be unclassified per the NEC, so the electrical wiring and devices in the area <br />are currently in compliance. <br /> <br />If the City would prefer to phase in the improvements over the next two years and the City's building official <br />agrees, we recommend one of the following options: <br /> <br />1. Make ail improvements in the digester building this year, then make the improvements in the grit and <br /> screen room next year; or <br /> <br />2. Make the improvements in the screen and grit room and part of the digester building improvements <br /> this year and make the remaining digester building improvements next year. <br /> <br />will call you to discuss and address any of your comments or questions regarding this matter, <br /> <br />Sincerely, <br /> <br />Howard P,. Green Company <br /> <br />Kevin F. Newman, P.E. <br /> <br />attachment <br /> <br />c: Terry Maurer - Howard R. Green Company <br /> <br />Ltr-011701-Leirmoe.doc <br /> <br />Howard R, Green Company <br /> CONSULTING ENGINEERS <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.