Laserfiche WebLink
PARTIAL PAYMENT ESTIMATE <br /> <br />FROM: <br /> TO: <br /> <br />CONTRACTOR: <br />ADDRESS: <br />OWNER: <br />PROJECT: <br /> <br />COMPLETION DATE <br /> SUBSTANTIAL: <br /> FINAL: <br /> <br />NO. 2 <br /> <br />September 25, 2000 <br />December 1, 2000 <br /> <br />RIDGEDALE ELECTRIC <br />500 BRIMHALL AVENUE, LONG LAKE, MN 55356 <br />CITY OF ELK RIVER, MINNESOTA <br />TRAFFIC CONTROL SIGNAL SYSTEMS & INTERCONNECT MAIN ST. / TH 169 & MAIN ST. / C <br /> <br /> AMOUNT OF CONTRACT <br />DECEMBER 1, 2000 ORIGINAL: $ 270,296.00 <br /> REVISED: $ 277,498.75 <br /> <br />:::::::::::::::::::::::::::::::::::: :.!i:! ::::::::::::::::::::::::::::::::::::::::::::::::::::[::iii[~::: i i i i::i i:.f. li :::i~i~i~?:.i::i::ii!:::::: im~:::::::::.::i:: f:~i::i ?: ~?:.ii~ i~ :, ~tCi~ii~ ~E[::~ ~i ?::i::i:: f: ii?? ![ f:~i~[~::i::i !iii!B~! ~ i E:.:.:: :: :::4: :4:/::7i <br /> <br /> SCHEOULE '1.O TRAFFIC SIGNALS <br /> <br />1 2021.501 MOBILIZATION LS 1 $2,500.00 0.00 $0.00 1.00 $2,500.00 <br />2 2104.607 HAUL SALVAGED MATERIAL LS 1 $1,500.00 0.25 $375.00 1.00 $1,500.00 <br />3 2563.601 TRAFFIC CONTROL LS 1 $2,000,00 0.25 $500.00 1.00 $2,000.00 <br />4 2563.604 TYPE "D" SIGNS Sf 132 $32.00 153.25 $4,904.00 153.25 $4,904,00 <br />5 2565.511 FULL TRAFFIC ACTUATED TRAFFIC CONTROL SIGNAL SYSTE SIGS 2 $123,700.00 020 $24,740.00 200 $247,400.00 <br />6 2565.601 EMERGENCY VEHICLE PREEMPTION SYSTEM "A" LS 1 $3,686.00 0.25 $921.50 1.00 $3,686.00 <br />7 2565.601 EMERGENCY VEHICLE PREEMPTION SYSTEM "B" LS 1 $3,686.00 0.25 $921.50 1.00 $3,686.00 <br />8 2565.601 TRAFFIC CONTROL INTERCONNECTION LS 1 $5,300.00 0.25 $1,325.00 1 00 $5,30000 <br /> <br />SCHEDULE 1.0 TRAFFIC SIGNALS --TOTAL <br /> <br />$33,68700 $270,976.00 <br /> <br /> SCHEDULE 2.0 ADDITIONAL WORK <br /> <br />1 SPEC CHANGE ORDER #1 LS 1 $4,42725 0.00 $0.00 1.00 $4,427.25 <br />2 SPEC ADOITIONAL SIGNAL WORK LS 1 $2,095 50 1 00 $2,095.50 1.00 $2,095.50 <br /> <br />SCHEDULE 2.0 ADDITIONAL WORK -- TOTAL <br /> <br />BID SUMMARY <br />SCHEDULE 1.0 TRAFFIC SIGNALS - TOTAL <br />SCHEDULE 2.0 ADDITIONAL WORK -- TOTAL <br /> <br />TOTAL BID SUMMARY THIS PERIOD <br />TOTAL BID SUMMARY TO DATE <br /> <br />$2,095.50 $6,522.75 <br /> <br />33,687.00 270,976.00 <br />2,095.50 6,522.75 <br /> <br />$35,782.50 <br /> <br />$277,498.75 <br /> <br />o ~Proj~8o8200~0o8 l~Payest ~ <br /> PAGE 1 <br /> <br /> <br />