My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. SR 01-16-2001
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2001
>
01/16/2001
>
4.1. SR 01-16-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:05 AM
Creation date
12/30/2002 4:12:56 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/16/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 <br />"(egular meeting of the Elk River Municipal Utilities Commission <br />December 12, 2000 <br /> <br />5.2 Update on Landfill Gas Generation Proiect <br /> <br /> Bryan Adams reviewed the Letter of Intent between Elk River Municipal Utilities and Elk River <br />Landfill, and the Resolution from Sherburne County Board of Commissioners. He further advised that the <br />preliminary engineering, project coordination and contract negotiation stages are now underway. The Pre- <br />engineering agreement was presented, and the Commission concurred that it was feasible. Staff will return with <br />the agreement at a future meeting. <br /> <br />It was noted that parts of the wind generators are now being put into place <br /> <br />5.3 Update Well #2, and Radon Remediation <br /> <br /> The acid washing of the filter media has not been successful in removing enough radium to be <br />successful. The remaining options are to landfill the media as hazardous waste or dilute the filter media with <br />sand to get the aggregate concentration below the minimum for a standard landfill. Prices are currently being <br />pursued for the landfill option. <br /> <br />5.4 Review Survey for Winter Installation of Residential Service Connections <br /> <br /> At the request of City Councilman, Thompson, his concern of requiring customers to arrange for <br />trenching in the winter season, Commission asked Staff to survey other Utilities on their practice in the winter <br />months. Commission and Staff reviewed the results and looked at four options. The option that has the Elk <br />River Municipal Utilities installing or contracting to install the trench with added frost charge appears to be the <br />most reasonable, and is recommended. <br /> <br /> James Tralle-moved to approve installation anct/or contracting for placing secondary services to <br />customers on a year round basis, with an added frost charge during winter months. George Zabee seconded the <br />motion. <br /> <br />6.1 Review and Consider Policy for Charges tO 3rd Parties <br /> <br /> Staff reviewed the policy involving invoices to other parties for services rendered, such as, costs and <br />damages to our system by others. The Utilities are not compensated for the administrative time spent in billing <br />and collection of these amounts. A suggested 10% increase on labor will cover supervision and administrative <br />indirect costs. <br /> <br /> James Tralle moved to increase by 10%, the labor portion of third party invoices. George Zabee <br />seconded the motion. Motion carded 3-0. <br /> <br />6.2 Review Minimum Bill for Demand and Off Peak Demand Customers <br /> <br /> Discussion centered on the present maximum billing demand at 30% of the demand charge or the actual <br />c~emand multiplied by the demand charge for a minimum bill, and the actual costs to the utility. Staff <br />recommends changing the 30% maximum charge to 3%. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.