Laserfiche WebLink
City Council <br />February 19, 2002 <br />Page 3 <br /> <br />The long west facade, facing Main Street, was discussed and the Planning Commission <br />would like to see larger windows than what was proposed by the applicant. <br /> <br />The Planning Commission voted unanimously to approve the request by Elk River <br />Municipal Utilities for a Condition Use Permit. <br /> <br />Recommendation <br /> <br />Staff and the Planning Commission recommend that the City Council approve the request <br />for a conditional use permit for construction of an equipment storage facility and office <br />space with the following conditions: <br /> <br />1. ALL COMMENTS OF THE CITY ENGINEER BE ADRESSED <br />2. THE BUILDING SHALL COMPLY WITH THE BUILDING CODE <br /> REQUIREMENTS. <br />3. THE NORTH, WEST & SOUTH BUILDING ELEVATIONS SHALL BE <br /> SIMILAR TO WHAT STAFF HAS PROPOSED. <br />4. THAT THE CITY BUILDING AND ENGINEERING INSPECTORS <br /> SHALL HAVE THE ABILITY TO SHUT DOWN CONSTRUCTION IF <br /> HISTORIC ARTIFACTS ARE FOUND DURING CONSTRUCTION IN <br /> ORDER TO ALLOW FURTHER ARCHAEOLOGICAL STUDY. <br /> <br />S:\PLANNING\Case Files\CU 02-02 ERUtilities\CU02-02 CC.DOC <br /> <br /> <br />