Laserfiche WebLink
Prior lake $70,000,000 <br /> <br />Building Official <br />Plans Examiner <br />Building Inspector <br /> <br />$64,657 <br />$55,103 <br />$55,103~ <br /> <br />Rosemount $90,000,000 Building Official $60,000 <br /> Building Inspector $52,000 <br /> <br />Ham Lake $25,000,000? Building Official $60,923 <br /> Building Inspector $49,795 <br /> <br />Farmington $90,800,000 Building Official $52,936 <br /> "' Building Inspector $49,400 <br /> <br />Mendota Heights $20,300,000 <br /> <br />Building Inspector <br /> <br />$52,141 <br /> <br />East Bethel $16,000,000 Building Inspector $50,860 <br /> (plus 3% match for deferred comp.) $1,526 <br /> <br />$52,386 <br /> <br />Building Inspector Position <br />Average [excluding Elk River, Prior Lake (high) and White Bear Lake (low)] = $51,882 <br />Average (excluding just Elk River) = $51,622 <br /> <br /> <br />