Laserfiche WebLink
DAY ONE - MONDAY, MARCH 4, 2002 (All Classes Are Full Day - Choose One Class Only Per Day) <br /> <br />[] <br />[] <br />[] <br />[] <br />[] <br />[] <br /> <br />181 Performance Management <br />182 Soils identification and Foundation Design <br />183 Accessibility Provisions of the 2000 IBC <br />184 IBC Advanced Occupancy Classification <br />185 Concrete Inspection <br />186 2000 International Residential Code <br /> <br />[] 187 The Front Counter Counts! <br />[] 188 IPC Water Distribution & Backflow Prevention <br />[] 189 Venting of Gas Appliances Using Venting Tables <br /> 190 2002 NEC Update <br /> 191 2000 IFC Overview (also check Day2) <br />[] 192 Fire Alarm Systems (also check Day 2) <br /> <br />DAY TWO - TUESDAY, MARCH 5, 2002 (All Classes Are Full Day - Choose One Class Only Per Day) <br /> <br />[] 281 Creative Problem Solving <br />[] 282 Wood Framing <br />[] 283 IBC Fire-Resistive Construction <br />[] 284 IBC Advanced Schematic Design <br />[] 285 Moisture Control & Indoor Air Pollution (also check Day 3) <br />[] 286 2000 IBC Overview: Nonstructural Provisions <br /> <br />[] 287 Zoning / Land Use <br />[] 288 IntemationaJ Fuel Gas Code & Gas Pipe Sizing <br />[] 289 Intemational Mechanical Code Overview <br />[] 290 Practical Difficulties in the Field for Electrical... <br /> 291 2000 IFC Overview (also check Day 1) <br /> 292 Fire Alarm Systems (also check Day 1) <br /> <br />DAY THREE - WEDNESDAY, MARCH 6, 2002 (Ail Classes Are Full Day - Choose One Class Only Per Day) <br /> <br />[] 381 Building Green: Alternate, Sustainable & Renewable ... <br />[] 382 Conventional Construction Provisions in Wood <br />[] 383 IBC: Building Classification I <br />[] 384 IBC Advanced Types of Construction <br />[] 385 Moisture Control & Indoor Air Pollution (also check Day 2) <br />[] 386 2000 IBC Overview: Nonstructural Provisions <br /> <br />[] 387 Blueprint Reading <br />[] 388 IPC / UPC Comparison and IPC Materials <br />[] 389 Commercial Kitchen Hoods <br />[] 390 Residential Provisions of the NEC <br /> 391 The 2000 Urban Wildland Interface (UWI) Code <br /> 392 Hydraulic Calculations for Fire Sprinkler Systems <br /> <br />DAY FOUR - THURSDAY, MARCH 7, 2002 (All Classes Are Full Day- Choose One Class Only Per Day) <br /> <br />[] 481 Administration & Management of the Building Function <br />[] 482 Structural Concepts and Performance <br />[] 483 International Building Code: Building Classification II <br />[] 484 IBC Advanced Means of Egress Components <br />[] 485 2000 International Residential Code <br />[] 486 IBC Wood Framing <br /> <br />[] 487 Permit Technicians Overview <br />[] 488 2000 IPC Overview <br />[] 489 Duct Systems inspection <br />[] 490 Grounding Fundamentals <br />[] 491 Company Level Fire Inspections (also check Day 5) <br /> 492 Fire Inspection, Testing & Approval of Water-Based Fire ... <br /> <br />DAY FIVE - FRIDAY, MARCH 8, 2002 (All Classes Are Full Day- Choose One Class Only Per Day) <br /> <br />[] 581 The ICC Performance Code for Buildings & Facilities <br />[] 582 2000 IBC: Overview of the Structural Provisions <br />[] 583 IBC Means of Egress <br />[] 584 IBC Advanced Means of Egress Design <br />[] 585 Roofing Inspection <br />[] 586 Prestressed Concrete Special Inspection <br /> <br />[] 587 Building Department Administration <br />[] 588 Advanced 2000 IPC Drain/Waste and Venting <br /> 589 Smoke and Fire Dampers <br />[] 590 System Grounding & Grounding Sensitive Equipment <br />[] 591 Company Level Inspections (also check Day 4) <br />[] 592 Indoor Fireworks <br /> <br /> e e e Call the Marriott DTC at (303) 779-1100 for Hotel Accommodations. ~, ~ ~ <br />Room rates are FederaJ Per Diem Rates, currently $ 86 for those with Govemrnent iD and $129 no~-govemment until Februa[y 9~, at which time ail rates will increase. <br /> <br /> <br />