Laserfiche WebLink
Northern States Power Company <br /> <br />414 Nico!let Mall <br />Minneapolis, Minnesota 55401-1993 <br />Telephone (612) 330-5500 <br /> <br />June 19,2000 <br /> <br />Mike Jones <br />11948 Nevada Avenue N. <br />Champtin, Mn 55316 <br /> <br />=,,"~r'A,":.,~'-',:'.." Septic Sys!ern <br /> <br />Line 984 <br />Section 22, Township 33, Range 26 <br /> <br />a~-:d Retaining Wail <br /> <br />Dear Mr. Jones: <br /> <br />Our Transmission Engineers have reviewed the septic system and retaining wall <br />encroachment. The proposed retaining wall cannot exceed 4 feet in height and must <br />not be greater than 5 feet into the easement. The encroachment for the septic <br />system it; acceptable to NSP under the following conditions: <br /> <br />(1) <br /> <br />Excavation close to structure location. <br /> <br />A minimum distance of 20 feet of supported earth must be maintained from <br />any part of the line structure. Support of the ground beyond the '20 feet may <br />be provided by a slope no greater than three feet horizontal to one foot <br />vertical. Support may also be provided, by the use of cribbing, sheet .piling, <br />retaining wal'l or tunneling. The specific plan for providing ~he required <br />support and the excavation plan for the Proposed projeot must be submitted <br />to NSP for review and approval. <br /> <br />(2) <br /> <br />Grade change within easement. <br /> <br />The ground elevation within the easement shall not be i~creased' above the <br />existing grade: Stockpiling of soil and/or material within the easement will <br />not be permitted. <br /> <br />(3) Clearances to equipment. <br /> <br />A working clearance of 25 feet between the electrical and any cranes or <br />digging equipment used in or near the easement, must be maintained at all <br />times. If this clearance cannot be maintained, the contractor or developer <br />must arrange for a line outage by calling NSP's System Co;~troi depar!rnent <br />(Carol Andrews 612/330-6135). At least two '^.'eeks sd',/ar~ced not'icrc must <br />be provided in order to schedule a line outage. There is a fee of <br /> <br /> <br />