My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.6. SR 4-15-2002
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2002
>
04/15/2002
>
7.6. SR 4-15-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:01 AM
Creation date
12/16/2002 9:37:55 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/15/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 6.1-3 <br />Breakdown of Year 2001 Project Costs by Estimated Timeframe and Jurisdiction <br /> <br /> Project Timeframe, Jurisdiction, and Estimated Costs <br /> Short-Term Medium-Term Long-Term <br />Project Costs: Costs: Costs: <br />No. Project 2002-2010 2010-2018 2018-2025 <br />1 TH 24 to CSAH 8 $13,944,000 (D3) <br />2 CSAH 8 to CSAH 11 $13,397,160 (D3) <br />3 CSAH 11 to Wa¢o Street <br /> - CSAH 11 to Waco Street w/o $51,448,960 (D3) <br /> CSAH 14/15 Interchange3 <br /> -CSAH 14/15 Interchange $5,500,000 (D3) <br />4 Waco Street to TH 169 <br />4A - Waco Street to 600' west of Proctor t 1525.998,767 (D3) <br /> [ - 600' west of Proctor to 950' east of $21,283,489 (D3) <br /> 4B Main St. <br /> 4C - 950' east of Main St. to TH 169 $5,754,240 (D3) <br /> $114,720,489 <br /> 5 TH 169 to Sunfish (Metro) <br /> 6 Sunfish to Round Lake Boulevard $95,025,767 <br /> (Metro) <br /> Round Lake Blvd to TH 610 . $101,495,375 <br /> 7 (8-1aries) (Metro) <br /> $14,250,338 <br /> 8 TH 610 to 1-35W (8-lanes) * (Metro) <br /> <br /> Total by Timeframe: Metro Division $95,025,767 $114,720,489 $115,745,713 <br /> Total by Timeframe: District 3 $5,500,000 $78,486,689 $53,339,927 <br /> Grand Total by Timeframe $100,525,767 $193,207,178 $169,085,640 <br /> <br />* Cost estimates for short-term, interim im ~rovements have not been developed. However, the long- <br />term cost estimates provided for projects 7 ~nd 8 assume that NO interim improvement projects have <br />been completed. <br /> <br />~FH 10 IRC Study <br />Corridor Management Plan <br />No. 813260d <br /> <br />6-5 <br /> <br /> January 2002 <br />Alternative Staging and Implementation <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.