My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. SR 04-15-2002
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2002
>
04/15/2002
>
5.4. SR 04-15-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:00 AM
Creation date
12/16/2002 9:09:05 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/15/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NORTHSTAR <br />@ $270M <br />(Through Preliminary Engineering = <br />30% Design and Engineering) <br /> <br />RULES OF THUMB <br /> <br />ACTUAL(includes <br />all Northstar <br />Corridor costs) <br /> <br />Mn/DOT State Aid Rule <br /> <br />Ao <br /> <br />Design and Engineering: <br />8-10% x % of project completed $27M (10%) <br /> x 30%. <br /> $8.1M <br /> <br />B. ElS (completed): 1% <br /> <br /> + 2.7M <br /> <br />$10.8M <br /> <br />TOTAL <br /> <br />$5.95M <br /> <br />+ 0.75M <br /> <br />$ 6.7M <br /> <br />II. <br /> <br />Industry Standard for Commuter Rail Rule <br /> <br />A. Design and Engineering: <br /> 3-6% of total project cost <br /> through Preliminary Engineering - <br /> <br /> $10.8M (4%) <br />B. ElS (completed): 1% + 2.7M <br /> TOTAL $13.5M <br /> <br /> NORTHSTAR: An FTA Recommended Project <br /> <br />$5.95M <br />+0.75M <br /> <br />$ 6.7M <br /> <br />Cleveland, Ohio - <br />$300M of which: <br /> 13M - Design & Engineering and ElS through Preliminary Engineerinng <br /> <br />FTA Review of $13M: Fair and Comparable to Industry Standards <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.