My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-15-2002 CC MIN
ElkRiver
>
City Government
>
City Council
>
Council Minutes
>
City Council 1974 - Present
>
2000-2009
>
2002
>
04-15-2002 CC MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:00 AM
Creation date
12/16/2002 8:57:02 PM
Metadata
Fields
Template:
City Government
type
CCM
date
4/15/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Minutes Page 13 <br />April 15, 2002 <br /> <br /> COUNCILMEMBER DIETZ MOVED TO ACCEPT THE BID FROM VISU- <br /> SEWER CLEAN & SEAL, INC. IN THE AMOUNT OF $7,560. <br /> COUNClLMEMBER KUESTER SECONDED THE MOTION. THE MOTION <br /> CARRIED 5-0. <br /> <br />7.4. Consider Funding and Timing of the 175th Avenue Improvement Watermain Construction <br /> <br />City Engineer Terry Maurer stated that Elk River Utilities has already taken action on this <br />item. He stated that the Utilities Commission has asked that the 175th Avenue watermain be <br />bid as alternate and Mr. Maurer suggested that half of the trail be bid as an alternate also. <br /> <br />The Council concurred with Mr. Maurer's suggestion. <br /> <br />7.5. Consider Resolutions Regarding Waco and Hwy. 10 Signal Project <br /> <br />City Engineer Terry Maurer stated that he has completed a feasibility study for the <br />signalization of the intersection of Highway 10 and Waco Street. He stated that three <br />commercial properties would be assessed one-quarter of the cost for installation of the <br />signal and a public hearing must be held. <br /> <br />COUNCILMEMBER TVEITE MOVED TO ADOPT RESOLUTION 02-31 <br />ORDERING A PRELIMINARY FEASIBILITY REPORT, RESOLUTION 02-32 <br />RECEIVING THE FEASIBILITY REPORT AND ORDERING A PUBLIC <br />HEARING ON THE IMPROVEMENT, AND RESOLUTION 02-33 <br />DETERMINING ASSESSED COST OF IMPROVEMENT AND ORDERING <br />PREPARATION OF PROPOSED ASSESSMENT ROLL IN THE MATTER OF <br />THE TRUNK HIGHWAY 10/WACO STREET INTERSECTION <br />SIGNALIZATION IMPROVEMENT OF 2002. COUNCILMEMBER MOTIN <br />SECONDED THE MOTION. THE MOTION CARRIED 5-0. <br /> <br />7.6. <br /> <br />Consider Resolutions Regarding Interregional Corridor Studies (Highway 10 and Highway <br />169) <br /> <br />City Engineer Terry Maurer stated that Elk River is the only community that hasn't adopted <br />the Highway 10 and Highway 169 Interregional Corridor resolutions. He discussed three <br />options for Council consideration. <br /> <br />Mayor Klinzing stated that she did not want to adopt any resolutions until MnDOT could <br />speak to the Council and the public at a City Council meeting. She would like to receive <br />public comment from Elk River residents, as these two studies would have a big impact on <br />the city. <br /> <br />City Administrator Pat Klaers suggested that a letter be sent to MnDOT acknowledging Elk <br />River's participation in the study and stating that the city is willing to sign the resolutions at <br />a later date after the city receives input from citizens. <br /> <br />The Council concurred on delaying consideration of these two resolutions until a later date. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.