Laserfiche WebLink
Board of Adjustments Minutes <br /> March 26, 2002 <br /> Page 3 <br />( Beth and Mike for Side Yard Setback Public <br /> Request <br /> by <br /> Willoughby <br /> Variance, <br /> Hearing <br /> Case No. V 02-03 <br /> <br />Staff report by Chris Leeseberg. Beth and Mike Willoughby, 19619 Tyler Street, request that <br />a variance be granted to allow a pottery shed/studio to be within the 35 foot front yard <br />setback and within the 20 foot side yard setback. Mr. Leeseberg presented a video of the <br />property, explaining that the property is very unique. He reviewed the location and <br />construction of the proposed 12' x 16' pottery shed. He noted that the peak of the shed will <br />be approximately at grade level of Tyler Street. Mr. Leeseberg reviewed the five findings <br />necessary for granting a variance, and why staff fek each of the findings can be met in this <br />case. Staff recommends approval of the variance. <br /> <br />Chair Pederson opened the public heating. <br /> <br />Commissioner Mesich asked how much of a variance is being requested. Mr. Leeseberg <br />explained that the variance would be for 8 feet from the side yard setback and 26 feet from <br />the front yard setback. <br /> <br />Mike Willoughby, applicant, 19619 Tyler Street, explained the terrain of the site and why <br />the site was chosen. Mr. Willoughby stated that his wife has health concerns that would <br />make k difficult for her tO navigat~ the steep slope if the shed where placed closer to the <br />house. <br /> <br />Commissioner Baker stated that he concurred that the applicant has very few options for <br />placement of the shed and he is in agreement with staff's recommendation for approval. <br /> <br />Chair Pederson stated that he feels the lay of the land constitutes a hardship and felt is was <br />appropriate to support the variance. <br /> <br />Commissioner Franz stated that he did not support the finding of a hardship and felt that <br />grading and excavation could resolve the issues with the steep slope. <br /> <br />Chair Pederson felt grading of the site would create a significant impact on the site and the <br />,trees,~ <br /> <br />Mr. Willoughby stated that he did consider excavation and ruled it out because of the <br />location of the septic system and well head, and possible damage to the foundation of his <br />home, if he excavated to the south. <br /> <br />Commissioner Franz asked how high the peak of the roof would be beyond the guard rail on <br />Tyler Street. Mr. Willoughby stated that the peak would be approximately 1 foot above the <br />rail. <br /> <br />Chair Pederson asked if there was an erosion problem. Mr. Willoughby stated that the area <br />where the drainfield is was constructed has some minimal erosion but when the vegetation is <br />re-established, the erosion will be eliminated. <br /> <br />There being no further public comment, Chair Pederson closed the public hearing. <br /> <br />COMMISSIONER BAKER MOVED TO APPROVE THE REQUEST BY BETH <br />AND MIKE WILLOUGHBY FOR A VARIANCE TO REDUCE THE SIDE YARD <br />SETBACK FROM 35 FEET TO 9 FEET, AND TO REDUCE THE FRONT YARD <br /> <br /> <br />