Laserfiche WebLink
FINAL PAYMENT ESTIMATE <br />NO. 2 <br /> <br />FROM: JUNE 22, 2002 <br /> TO: JULY 28, 2002 <br /> <br />CONTRACTOR: NORTHWEST ASPHALT <br /> <br /> ADDRESS: 1451 COUNTY ROAD 18, SHAKOPEE, MN 55379 <br /> <br /> OWNER: CITY OF ELK RIVER, MINNESOTA <br /> <br /> PROJECT: MAIN STREET LEFT TURN LANE IMPROVEMENTS <br /> <br />COMPLETION DATE AMOUNT OF CONTRACT <br />SUBSTANTIAL: ORIGINAL: <br />FINAL: JUNE 28, 2002 REVISED: <br /> <br />$26,827.00 <br /> <br />SCHEDULE 1.0 STREET CONSTRUCTION <br /> <br />I MOBILIZATION LS 1.00 3,745.00 0.00 <br />2 REMOVE CONCRETE CURB LF 260.00 4.10 0.00 <br />3 REMOVE CONCRETE MEDIAN SF 2,700.00 0.60 0.00 <br />4 SALVAGE SIGN EACH 1.00 50.00 0.00 <br />5 SAWING CONCRETE PAVEMENT (FULL DEPTH) LF 260.00 4.00 0.00 <br />6 MILL BITUMINOUS SRFACE (1.5'~ SY 120.00 5.75 0.00 <br />7 COMMON EXCAVATION (P) CY 120.00 17.25 0.00 <br />6 AGGREGATE BASE, CLASS 5 TON 130.00 18.50 0.00 <br />9 TYPE 2350 WEARING COURSE MIXTURE TON 45.00 30.95 0.00 <br />10 TYPE 2350 NON-WEARING COURSE MIXTURE TON 30.00 30.95 0.00 <br />11 BITUMINOUS MATERIAL FOR TACK COAT GAL 18.00 5.00 Q00 <br />12 CONCRETE CURB & GUTTER, DESIGN B618 LF 260.00 17.10 Q00 <br />13 CONCRETE MEDIAN SF 1,265.00 3.75 0.00 <br />14 TRAFFIC CONTROL LS 1.00 800.00 0.00 <br />15 4" SOLID LINE WHITE - EPOXY LF 120.00 7.00 150.00 <br />16 INSTALL SIGN EACH 1.00 100.00 0.00 <br />17 SUBGRADE DENSITY TEST, INPLACE EACH 1.00 85.00 0.00 <br />18 GRADATION TEST, CLASS 5 EACH 1.00 85.00 0.00 <br />19 PROCTOR TEST, CLASS 5 EACH 1.00 85.00 Q00 <br />20 CLASS 5 DENSITY TEST, INPLACE EACH 2.00 85.00 0.00 <br />21 BITUMINOUS CORE TEST EACH 3.00 75.00 0.00 <br />22 CONCRETE TESTING EACH 1.00 150.00 0.00 <br /> <br /> $0.00 <br /> $0.00 <br /> $0.00 <br /> ;0.00 <br /> ;0.00 <br /> I0.00 <br /> ;0.00 <br /> ;0.00 <br /> ~0.00 <br /> ;0.00 <br /> ;0.00 <br /> $0.00 <br /> $0.00 <br /> $0.00 <br /> <br />$1,050.00 <br /> SQ00 <br /> $0.00 <br /> $0.00 <br /> $0.00 <br /> $0.00 <br /> $0.00 <br /> $0.00 <br /> <br />1.00 $3,745.00 <br />260.00 $1,066.00 <br />2,250.00 $1,35Q00 <br />0.00 $0.00 <br />260.00 $1,040.00 <br />154.00 $885.50 <br />120,00 $2,070.00 <br />112.76 $2,086.06 <br />65.43 $2,025.06 <br />47.11 $1,458.05 <br />40.00 $200.00 <br />260.00 $4,446.00 <br />0.00 $0.00 <br />1.00 $800.00 <br />150.00 $1,050.00 <br />0.00 $0.00 <br />0.00 $0.00 <br />1.00 $85.00 <br />1.00 $85.00 <br />1.00 $85.00 <br />0.00 $0.00 <br />1.00 $150.00 <br /> <br />SCHEDULE 1.0 STREET CONSTRUCTION - TOTAL <br /> <br />$I ,050.00 <br /> <br />$22,626.67 <br /> <br />BID SUMMARY <br /> <br />SCHEDULE 1.0 STREET CONSTRUCTION - TOTAL <br /> <br />$1,050.00 <br /> <br />$22,626.67 <br /> <br />TOTAL BID SUMMARY THIS PERIOD <br />TOTAL BID SUMMARY TO DATE <br /> <br />$1,050.00 <br /> <br />$22,626.67 <br /> <br />AMOUNT EARNED $1,050.00 $22,626.67 <br />AMOUNT RETAINED -$1,078.83 1 $0.00 <br /> <br />!!!!!iiPREVIOUSD PAYMENTS E i~ ............ i $2,128.83 ~*~'°;~*i i; .............. i i' '~'2~ $2,128.83~4~)'~ ~' <br /> <br /> <br />