My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.7. SR 10-21-2002
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2002
>
10/21/2002
>
6.7. SR 10-21-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:31:57 AM
Creation date
10/18/2002 7:56:55 PM
Metadata
Fields
Template:
City Government
type
SR
date
10/21/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sE~ NOTE, <br /> RE~ RESTORATION .i:~. <br /> <br />",, APPARENT <br />t,(idATCH~) ,' <br /> <br />SLAB ~ CAST~NOj ~ <br /> <br />~ ADJU~Y <br /> <br /> ~H <br /> <br />882.88 <br /> <br />INLET PROTECTION <br />7 LOCATIONS <br /> <br />FFE 88,t.76 <br /> <br />RE 883.70 <br />~ 881.00 ........ <br /> <br />RE 884.26 <br /> <br />ROCK <br /> CROSS <br /> <br />TION <br /> <br /> ~' <br />OCK ~(~NSTRUCTION <br /> <br />',% <br /> <br /> LEGEND 1~ <br />........ I070 --- Ex~sting Contours I <br />--898 ~ Proposed contou, s <br /> <br /> x 900.0 Existing Spot Elevotions <br /> x 75.5 Proposed Spot EJevotion <br /> Silt ~ence <br /> <br />....... Grading Limits <br /> 0 50 I00 <br /> <br /> 4.2% Drainage Slope I <br /> ~ SCALE IN <br />I II II Proposed Storm Sewer <br /> <br /> -~ Oroinoge Direction <br /> ~ Rock Construction Entrance <br /> <br /> 150 <br /> <br />FEET <br /> <br />NOTE: <br /> <br />ALL SPOT ELEVATIONS ARE TO TOP OF CURB UNLESS NOTED OTHERWISE <br /> <br />RESTORATION OF ALL NON PAVED DISTURBED AREAS SHALL BE w/MNDOT 5876 <br />TEMPORARY SEED MIXTURE 150B AND 4" OF SALVAGED TOPSOIL. SLOPES IN EXCESS <br />OF 5:1 SHALL RECEIVE WOOD FIBER BLANKET MNDOT 5885 CATEGORY 5 - ALL <br />OTHER AREAS SHALL RECEIVE TYPE I MULCH MNDOT 3882 ALL TEMPORARY <br />RESTORATION SHALL BE COMPLETED WITHIN 14- DAYS OF COMPLETION OF ROUGH <br />GRADING AND SHALL BE COMPLETED IN ACCORDANCE w/THE PROVISIONS OF' MNDOT <br />2575. PERMANENT RESTORATION SHALL BE BY OTHERS IN ACCORDANCE w/A <br />LANDSCAPE PLAN. <br /> <br />NOTE: <br />ALL NEW STORM SEWER STRUCTURES SHALL BE 4'DIA. SLAB TOP EXCEPT AS NOTED <br />w/NEENAH R 2505 CASTING. ALL INLETS SHALL RECEIVE INLET PROTECTION <br /> <br /> Z <br /> <br />O :~ a_ <br />~_ <br />O a~ z <br /> <br /> © <br /> <br />SHEET NO / <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.