Laserfiche WebLink
- EXHIBIT B <br /> <br />Conditions: <br /> <br />I0. <br /> <br />ALL COMMENTS OF THE CITY ENGINEER SHALL BE <br />ADDRESSED. <br /> <br />PHASING OF THE CONSTRUCTION OF UNITS SHALL BE <br />DETERMINED AND TIPIED BASED ON CONNECTING THE <br />STREETS IN THE SUBDIVISION TO A SECOND ACCESS POINT <br />(TEMPORARY OR PERMANENT) TO TWIN LAKES ROAD. <br /> <br />ALL COMMENTS OF SHERBURNE COUNTY SHALL BE <br />ADDRESSED. <br /> <br />THE DEVELOPER SHALL ENTER INTO A DEYELOPER'S <br />AGREEPIENT OUTLINING THE TERPIS AND CONDITIONS OF <br />THE DEVELOPMENT. <br /> <br />THAT THE MAILBOXES SHALL BE CLUSTERED. <br /> <br />ANY ADDITIONAL ARTIFACTS THAT ARE FOUND DURING ANY <br />PHASE OF THE PROJECT SHALL BE REPORTED IPIPIEDIATELY <br />TO THE CITY AND SHPO. THE CITY BUILDING AND <br />ENGINEERING INSPECTORS SHALL HAVE THE ABILITY TO <br />SHUT DOWN CONSTRUCTION IF HISTORIC ARTIFACTS ARE <br />FOUND DURING CONSTRUCTION IN ORDER TO ALLOW <br />FURTHER ARCHAEOLOGICAL STUDY. <br /> <br />A SEALCOAT FEE IN THE AMOUNT DETERMINED BY THE CITY <br />BE PAID PRIOR TO RELEASING THE PLAT FOR RECORDING. <br /> <br />AN ENGINEERING ESCROW IN THE AMOUNT DETERMINED BY <br />THE CITY BE PAID PRIOR TO RELEASING THE PLAT FOR <br />RECORDING. <br /> <br />PARK DEDICATION FEES IN THE APIOUNT DETERPIINED BY <br />THE CiTY BE PAID PRIOR TO RELEASING THE PLAT FOR <br />RECORDING. <br /> <br />STORM WATER MANAGEMENT FEES IN THE AMOUNT <br />DETERHINED BY THE CITY BE PAID PRIOR TO RELEASING THE <br />PLAT FOR RECORDING. <br /> <br />Document4 Page 6 <br /> <br /> <br />