Busway @ $3 Busway @ $7 Busway @ <br /> million per million per $11 million <br /> Northstar mile mile per mile <br />Capital Cost 15243,253,300 $246,000,000 $574,000,000 $902,000,000 <br />Annualized CostI $19,900,048 $24,105,143 $56,245,333 $88,385,523 <br />Annual Operating Cost with <br />10,000 trips/day $13,698,157 $27,074,520 $27,074,520 $27,074,520 <br />Total Annual Cost $33,598,205 $51,179,663 $83,319,853 $115,460,043 <br />Annual Passenger Miles 49,226,400 49,226,400 49,226,400 49,226,400 <br />Total Cost per Passenger Mile $0.68 $1.04 $1.69 $2.35 <br />Annual Operating Cost with <br />8,000 trips/day $21,659,616 $21,659,616 $21,659,6161 <br />Total Annual Cost $45,764,759 $77,904,949 $110,045,139 <br />Annual Passenger Miles 39,381,120 39,381,120 39,381,12C <br />Total Cost per Passenger Mile $1.16 $1.98 $2.79 <br />Annual Operating Cost with <br />5,000 trips/day $16,244,712 $16,244,712 $16,244,712 <br />Total Annual Cost $40,349,855 $72,490,045 $104,630,235 <br />Annual Passenger Miles 29,535,840 29,535,840 29,535,840 <br />Total Cost per Passenger Mile $1.37 $2.45 $3.54 <br /> <br />All figures are in 2001 dollars <br />According to the National Transit Database, buses cost $0.50 to $0.60 per passenger mile <br /> to operate, on average, across the United States. Therefore $0.55 per mile was used here <br />Since a breakdown of busway costs was not available, they were split using Northstar as a <br /> basis. Rail vehicle cost percentages were assigned to buses. Trackwork and signal cost <br /> percentages were assigned to pavement. This formed the basis for annualizing the capital <br /> The busway was assumed to be 82 miles long; the same length as Northstar. <br />Busway cost per passenger mile was estimated for ridership at 100%, 80%, and 60% of <br /> estimated Northstar ridership. <br /> <br /> Busway @ $3 Busway @ $7 Busway @ <br /> million per million per $11 million <br />Basis for Annualization Northstar mile mile per mile <br />RNV Costs $1,111,607 $1,124,159 $2,623,037 $4,121,915: <br />RAN Preparation $390,173 $394,579 $920,684 $1,446,788 <br />Structures $5,401,655 $5,462,648 $12,746,179 $20,029,709 <br />Trackwork, Signals $6,205,410 $0 $0 $0 <br />Pavement, Parking Lots $470,160 $7,758,123 $18,102,286 $28,446,450 <br />Rail Vehicles $6,321,043 $0 $0 $0 <br />Buses $0 $9,365,634 $21,853,147 $34,340,660 <br />Total I $19,900,0481 $24,105,1431 $56,245,3331 $88,385,523 <br /> <br /> <br />