My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4C. SR 07-22-2002
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2002
>
07/22/2002
>
5.4C. SR 07-22-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:31:54 AM
Creation date
9/24/2002 3:23:45 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/22/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
occupying each of the three levels as follows: <br /> <br />Level 1: City Engineer <br /> <br />FHnetions: <br /> <br />· Attend meetings - staff, developer, planning commission, city council (person would <br /> act as a liaison and present staff reports or routine items but not major project <br /> reports) - 10 %. <br /> <br />· Attend concept review meetings - 10%. <br /> <br />· Review plans for development projects - 20%. <br /> <br />· Conduct field inspections - 5 %. <br /> <br />· Prepare mapping and graphic information - 5 %. <br />· Financial and project administration - 15 %. <br /> <br />· Long-range planning - 10%. <br />· Review of project plans - 10%. <br /> <br />· General departmental city administration/support - 15 %. <br /> <br />Level 2: Experienced engineering technician. <br /> <br />Function.q: <br /> <br />· Attend concept review meetings - 20 %. <br /> <br />· Review plans (public and private development projects) - 30 %. <br />· Conduct field inspections - 20%. <br /> <br />· Prepare mapping/graphics - 10%. <br /> <br />· Record administration/management - 15%. <br />· Complete small field design/construction projects - 5 %. <br /> <br />Level 3: Experienced design technicians, field construction inspectors, and office support <br />staff. <br /> <br />Function~: <br /> <br />· Conduct preliminary surveys, field investigations - 20%. <br />· Prepare project design plans and specifications - 40%. <br /> <br />· Conduct field surveys, project inspections - 30% <br />· Records administration and management - 10 %. <br /> <br />230/000-3001 .mar <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.