My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. PCSR 04-08-2008
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2008
>
04-08-2008
>
5.2. PCSR 04-08-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2008 4:01:40 PM
Creation date
4/4/2008 3:53:14 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
4/8/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(05) Phase IV Water Quality Monitoring Work Plan. The Phase IV Water <br />Quality Monitoring Work Plan which describes the sampling frequency, <br />parameters, protocols and reporting frequency for landfill gast, leachate, leachate <br />piezometers, leachate lysimeter, residential wells, groundwater monitoring wells <br />and surface water shall be updated annually to reflect changes in the monitoring <br />systems. The monitoring plan shall yield adequate information for assessing the <br />effectiveness of the landfill gas control system in decreasing VOC contaminants <br />in the groundwater. <br />(06) Annual Gas Vent System Assessment. Annually assess the effectiveness <br />of active landfill gas venting operations based on the results of groundwater and <br />landfill gas monitoring. Incorporate the evaluation in the MPCA Annual Report <br />for the landfill. <br />(07) Heavy Metal Contaminant Monitoring and Assessment. Heavy metal <br />contaminants for surface water and groundwater must be addressed in addition <br />to VOC contaminants. Based on the need for additional monitoring to confirm <br />exceedances and identify trends, the Landfill shall continue monitoring and <br />prepare evaluation reports which shall be submitted with the MPCA Annual <br />Reports. <br />(08) Heavy Metal Contamination Feasibility Study. If heavy metal <br />concentrations in groundwater and surface water exceed regulatory standards, <br />the Landfill will be required to conduct a Feasibility Study and submit it to City <br />staff on schedule determined by City staff. <br />(09) Construction Quality Assurance Reports. A Construction Quality <br />Assurance (CQA) Report shall be submitted to the City prior to the placement of <br />waste on newly constructed lined areas. A CQA report shall also be submitted <br />for Landfill areas which receive final cover. The report shall demonstrate that <br />the work is completed to the plan specifications. The Report shall be certified by <br />an engineer registered in the State of Minnesota and shall include but not be <br />limited to: <br />(a) All relevant construction specifications; <br />(b) All shop drawings for prefabricated components; <br />(c) Photo documentation of all critical aspects of construction; <br />(d) Deflection testing results for leachate collection and transmission <br />pipes; <br />(e) Narrative description of all as-built variances from the plans and/ or <br />specifications; <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.