My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. PCSR 04-08-2008
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2008
>
04-08-2008
>
5.2. PCSR 04-08-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2008 4:01:40 PM
Creation date
4/4/2008 3:53:14 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
4/8/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.) Scope and Conduct of Landfill Operations. The operation of a solid <br />waste landfill may be conducted on the Landfill Property in conformance with <br />existing statutory and regulatory authority and requirements of the City, <br />Sherburne County (the County), and the Minnesota Pollution Control Agency <br />(MPCA); and in accordance with authorization and limitations contained in: <br />(O1) MPCA Solid Waste Permit No. 74; <br />(02) the current Sherburne County Solid Waste Landfill License of the <br />Permittee; <br />(03) the current City Solid Waste Facility License of the Permittee; and <br />(04) this Permit. <br />Landfill operations may be conducted on the Landfill Site only in <br />accordance with the plans, descriptions and reports incorporated in said permits <br />and licenses. Provided, however, that the entire Landfill shall have a final <br />elevation of no more than 1120 feet above MSL including final cover, as provided <br />in the Long Term Development Plan submitted to the City dated March 1997, <br />and as revised on April 15, 1997. Any changes made to the plans, descriptions, <br />reports, permits and licenses, including MPCA Solid Waste Permit No. 74 and <br />the County License, shall also be reviewed and approved, approved with <br />modification, or disapproved by the City as described in the current License <br />issued by the City. <br />2.) Scope and Conduct of Related Operations. <br />(O1) Recycling Center. The operation of a recycling center on the Landfill <br />Property may be conducted,' if in conformance with all applicable terms and <br />conditions of this Permit, subject to the following conditions: <br />(a) The operation of the recycling center shall comply in all respects <br />with all applicable requirements of the City Code of Ordinances and <br />all applicable federal, state, and county laws and regulations. <br />(b) The recycling center shall be located and operated as shown on <br />plans submitted by Permittee and approved by City staff. The <br />recycling center may accept additional materials, including <br />household hazardous wastes, provided that Licensee's plan for <br />handling additional materials and any changes to the recycling <br />center shall first be approved in writing by the City. <br />(c) The recycling center shall be operated by Permittee. Operation of <br />the recycling center by a different operator shall require the prior <br />written approval of City staff. Any different operator of the recycling <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.